Bathroom demolition cost in South Florida runs $2,750–$4,250 to gut a typical 5x8 to 8x10 bathroom to the studs and slab: tile, tub or shower, vanity, toilet and drywall, with debris hauled away. A shower alone is $1,250–$2,000, and removing just the floor tile is $4–$6 per sq ft. Mud-set tile, cast iron tubs and condo high-rises cost more. J. Perry & Sons tile removal and demolition does demo as a standalone job or as the first phase of a remodel.
| Scope | What's removed | Typical cost |
|---|---|---|
| Floor tile only | Tile and thinset ground off, haul-away | $4–$6 per sq ft; $5.50–$8 if mud-set |
| Shower only, standard 3x5 | Wall tile, backer, pan, curb, glass | $1,250–$2,000 |
| Tub and surround | Tub, tile surround, backer | $1,500–$2,500; more for cast iron |
| Full bathroom gut, 5x8 to 8x10 | All tile, tub or shower, vanity, toilet, mirror, drywall, haul-away | $2,750–$4,250 |
| Master bath gut, 100–160 sq ft | Same, larger room, double vanity, separate tub and shower | $4,250–$7,000 |
| Dustless upgrade | Vacuum-shrouded grinding and containment | +$1–$1.50 per sq ft of floor |
The plumber caps supply lines and drains as part of the demo, and the cost of that cap-off is included in our remodel pricing. If you're hiring us for demo only, ask us to include it so the house has water the same night.
Most of our bathroom demos are phase one of a bathroom renovation, where the guest bath runs $20,000–$30,000 and the master $38,000–$75,000+, and demo is a line inside that price. Standalone demo makes sense when:
Free estimate — call (561) 556-7509 or send us your project. Send photos of the bathroom and a rough size and we'll send a same-day range.
Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.
Older materials. Some older floor tiles, adhesives and wall finishes may contain materials that need testing before demolition. Ask for a test when the house is older; if a test is positive, a licensed abatement contractor handles removal.
Condos. Associations usually require contractor approval, insurance certificates and noise-hour compliance. Some require a deposit for elevator use. See the condo renovation rules checklist.
Permits. Demo as part of a remodel falls under the remodel permit when one is required. Moving drains or valves, adding circuits or changing the layout typically needs a permit in Broward, Palm Beach and Miami-Dade; we pull it.
Humidity. Once the room is open, run the AC so framing and slab don't hold moisture before the rebuild.
Related guides: Tile demolition: what to expect · Shower demolition and rebuild · Dustless tile removal
Prefer to send photos or plans? Send us your project
How much does it cost to demo a bathroom? $2,750–$4,250 for a typical full bathroom gut with haul-away, $4,250–$7,000 for a large master bath, and $1,250–$2,000 for a shower only.
How long does bathroom demolition take? One to two days for most bathrooms, two to three for a large master with a separate tub and shower.
Can I stay in the house during bathroom demo? Yes, in most cases. We seal the room with plastic, cover AC returns and protect the path to the door. Dustless grinding cuts most of the airborne dust.
What happens if you find damage behind the tile? We stop, send photos, explain the repair and its price, and continue only after your approval.
How do I get an exact price? Call (561) 556-7509 or send photos and rough dimensions through our project form. A written estimate is typically ready within 24–48 hours after a site review and scope confirmation.
Free estimate — call (561) 556-7509 or send us your project. Licensed Florida general contractor CGC1540699. Serving Broward, Palm Beach and Miami-Dade counties.
Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.