Warm white master bathroom with a walk-in shower and double vanity
Bathroom

Bathroom Renovation Cost Guide for South Florida 2026: Master Bath, Guest Bath & Spa Upgrades

Request a Free Project Review
FL CERTIFIED GC ·CGC1540699
150+Projects Completed
Free Project ReviewBook yours today
WorkmanshipWarranty

By John Perry

After the project review, your written proposal lists the following scope and pricing: Got a bathroom quote for and another for for what sounds like the same job?. Bathroom pricing is confusing because every contractor includes different things, and because bathrooms hide a lot of work behind the walls and under the floor: plumbing, waterproofing, permits, structural repairs.

This guide gives you real 2026 bathroom renovation prices in South Florida, explains exactly what's included at each level, and shows what pushes a project up or down, so you can plan a budget and compare quotes with confidence.

Bathroom renovation prices at a glance (2026)

These are J. Perry & Sons starting prices. They include labor, setting materials, waterproofing, the permit and project management. Tile, vanities, fixtures and glass are your selections and are listed as separate lines, because they vary so much. Final pricing is based on the condition of the bathroom and the full scope, and we confirm it after reviewing your project.

Comparison of bathroom renovation scopes and starting prices

ProjectTypical sizeStarting from
Master bath, same layout: walk-in shower, floor, double vanity, lighting80–120 sq ftStarting at $46,500
Master bath with layout change: moved drains, freestanding tub, curbless shower100–160 sq ftStarting at $46,500

The Owner's Guide to Bathrooms and Showers

The technical detail behind a bathroom built to stay watertight: waterproofing and flood tests, shower slopes, tile and stone, vanities, glass, permits, condo rules and how to compare bathroom quotes.

+ Free one-page checklist: Before You Remodel Your Bathroom

What's included in a full bathroom renovation

A complete bathroom remodel from us typically includes:

  • Protection and demolition of tile, tub or shower, vanity and fixtures, with debris hauled away
  • Inspection and repairs of the subfloor, slab, framing and any water damage found
  • Plumbing rough-in changes and fixture connections by licensed plumbers we coordinate
  • Electrical for lighting, outlets, exhaust fan and heated floors by licensed electricians we coordinate
  • Shower pan built by hand with pre-slope, liner or membrane, mortar bed and a flood test
  • Waterproofing of shower walls, niches and benches
  • Cement board or waterproof boards, drywall and finishing
  • Tile on floors, shower walls and floors, accent walls
  • Vanity, countertop, toilet, fixtures and mirror installation
  • Glass enclosure coordination
  • Paint, trim and final cleaning
  • Permit and inspections

We're a licensed Florida general contractor (CGC1540699), so one company manages the whole bathroom, including the plumbing and electrical by licensed plumbers and licensed electricians, coordinated and permitted by J. Perry & Sons.

Free Project Review

Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.

Where the money goes

Bathroom renovation budget categories and proportions

In a typical South Florida master bath remodel, the budget splits roughly like this:

  • Labor and installation (tile, carpentry, finishing): about 35–45%
  • Shower system and waterproofing: about 10–15%
  • Plumbing and electrical (licensed trades): about 15–20%
  • Materials you select (tile, vanity, fixtures, glass): about 20–35%
  • Permits, protection, project management: the rest

Your selections can swing the total by tens of thousands. After the project review, your written proposal lists the following scope and pricing: A vanity and a vanity look very different on the final number.

What makes a bathroom cost more

  1. Moving plumbing. Relocating a toilet, shower drain or tub means cutting the slab in most Florida homes, then patching and inspection.
  2. Curbless showers. The floor has to be recessed or ramped so water stays in the shower, which adds slab work and waterproofing.
  3. Large-format tile and slabs. Bigger tiles need flatter walls and floors and more labor per piece. Porcelain slab shower walls cost more but have almost no grout.
  4. Natural stone. Marble needs white mortar, sealing and careful handling.
  5. Custom features. Niches, benches, linear drains, rain heads, body sprays, steam showers.
  6. Hidden damage. Rotted framing, leaks, mold or failed waterproofing found during demolition.
  7. Condo requirements. Sound underlayment, insurance certificates, work hours, elevator time and association approvals.
  8. High-end fixtures and glass. Frameless heavy glass, designer faucets, freestanding tubs.

What makes a bathroom cost less

  • Keep the layout. Leaving the toilet, shower and vanity where they are avoids slab and plumbing changes.
  • Standard sizes. 12x24 or 24x24 porcelain instead of panels or mosaics everywhere.
  • One accent, not five. Spend on one feature wall or a statement vanity.
  • Prefabricated vanities instead of custom millwork.
  • Shower door choice. A semi-frameless door costs less than heavy frameless glass.
  • Do two bathrooms together. One mobilization, one permit process, bulk tile purchase.

Typical examples (labor, setting materials, waterproofing, permit, management)

Each row shows a typical scope for that kind of project and its starting price.

ProjectWhat was doneTypical range
Guest bath, Coral SpringsTub stays, new wall and floor tile, new vanity and fixturesStarting at $46,500
Hall bath tub-to-shower, Fort LauderdaleTub out, walk-in shower with niche, glass, new floorYour written proposal sets the number after the project review.
Master bath, ParklandSame layout, large-format walk-in shower, double vanity, LED mirrorsStarting at $46,500

Material selections are added on top.

How we schedule a bathroom renovation

We don't publish standard durations, because every bathroom is based on things we can only measure on site. The schedule for your project is in your written proposal, confirmed after the project review. These are the things that decide it:

  • Layout. Keeping the toilet, shower and vanity in place, or moving drains and cutting the slab.
  • What demolition uncovers. Rotted framing, leaks, mold or failed waterproofing is repaired before the new shower is built.
  • Permits and approvals. City permit review, inspections and condo association approval. Ask your association for its review calendar; we build the approval into the schedule in your proposal.
  • Waterproofing and flood test. The shower pan and walls are waterproofed and flood-tested before any tile goes on.
  • Material in one lot. We plan the start around delivery of all the tile from the same dye lot, plus special-order vanities and custom slabs.
  • Glass. Shower glass is measured after tile and installed once it's fabricated.

Permit approval, special-order materials (vanities, glass, custom slabs) and inspections affect the schedule.

Permits for bathroom remodels in South Florida

Most bathroom remodels that change plumbing, electrical, waterproofing or the shower need a building permit, and condos usually need association approval too. J. Perry & Sons pulls its own permits and follows every city and county requirement. The permit is included in our renovation pricing. Unpermitted bathroom work can cause problems with insurance claims and when you sell.

Bathroom renovation in condos

South Florida condo bathrooms come with extra rules:

  • association application and approval before work
  • certificate of insurance naming the association
  • approved sound-control underlayment under new tile
  • limited work hours, elevator reservations and debris rules
  • strict waterproofing, because a leak goes into the unit below

We handle the paperwork and plan around the building. See condo renovation contractor.

Budget planning checklist

  1. Decide what stays and what moves (layout changes are the biggest cost lever).
  2. Pick a material level: standard porcelain, large format, or stone and slabs.
  3. Choose vanity, fixtures and glass, or set allowances.
  4. Add 10–15% contingency for hidden damage, especially in homes over 20 years old.
  5. Confirm what's included: permit, plumbing, electrical, glass, paint, disposal.
  6. Plan where you'll shower while the bathroom is under construction.

How to compare bathroom quotes

Put the quotes side by side and check:

  • Is the shower pan built by hand with a flood test, or a quick prefab base?
  • Which waterproofing system is used on the walls?
  • Are plumbing and electrical done by licensed trades and included?
  • Is the permit included?
  • Are tile, vanity, fixtures and glass included or allowances?
  • What happens if damage is found behind the walls?
  • Is there a workmanship warranty?

The cheapest quote often skips waterproofing details or leaves the permit out. In a bathroom, those are the steps that prevent leaks and failed inspections.

Choosing materials for a South Florida bathroom

  • Porcelain for floors and walls: waterproof, durable, endless looks.
  • Large-format porcelain or slabs in showers for fewer grout lines.
  • Honed marble for a luxury primary bath, with proper sealing.
  • Mosaic or textured tile on shower floors for grip.
  • Quartz or quartzite vanity tops, low maintenance.
  • Frameless glass for a clean, open look.
  • Exhaust fan sized correctly for Florida humidity.

Is a bathroom remodel worth it in South Florida?

Bathrooms are one of the rooms buyers judge most closely. A dated primary bath can make a whole house feel old in listing photos, while a renovated one signals a well-maintained home. Beyond resale, a remodel fixes problems that cost money every year: hidden leaks, mold, poor ventilation and fixtures that waste water. For most homeowners staying five years or more, a well-planned bathroom remodel is one of the best-value renovations they can make.

Payment schedule

Allowances vs selections

After the project review, your written proposal lists the following scope and pricing: Some contractors quote bathrooms with "allowances" (for example, for a vanity). If you choose something more expensive, the difference is added later. We prefer to price your actual selections whenever they're known, or give realistic allowances based on what clients in your price range typically choose, so the final number doesn't jump at the end.

Why our bathroom prices start mid-range

We build every shower with a hand-built pre-slope, a proper waterproofing system and a flood test, pull the permit, and use licensed trades for plumbing and electrical. That's what keeps a bathroom dry and inspection-ready for decades, and it's why our starting prices aren't the lowest you'll see. The number in your proposal is the number you pay, unless you change the scope or we find hidden damage, which we always show you first.

How to keep a bathroom budget on track

  • keep the toilet, sink and shower drain in their current locations when possible
  • choose tile and fixtures before demolition, so nothing waits on selections
  • spend on what you touch every day: the shower, the vanity top and the faucet
  • plan storage inside the vanity and a niche in the shower instead of extra furniture
  • keep a contingency for what's behind the old tile in older homes

Every one of these keeps the project inside the price level you started with.

Get a price for your bathroom

Send us photos of your bathroom and what you'd like to change, or call (561) 556-7509. We'll visit and bring samples. Send us your plans and we'll prepare a written proposal; once you sign the proposal, we can provide a simple rendering. J. Perry & Sons is a licensed Florida general contractor (CGC1540699) with 150+ completed projects and a workmanship warranty.


Next step

Send us a photo of the look you want and a photo of your house. We'll tell you what it's called, how we'd build it and the starting price.

Free Project Review. We look at your project with you and tell you what's possible and a starting price.

Call (561) 556-7509

By submitting, you agree that J. Perry & Sons may contact you by phone, text or email about your project.

Make room for your daily retreat.

Let's create a bathroom that brings calm to every day.

Plan My Bathroom

Free project review · (561) 556-7509

Bathroom architectural design concept

FAQ

How much does a bathroom remodel cost in South Florida? A guest bath with the same layout typically starts at $46,500 and a master bath starting at $46,500 including labor, setting materials, waterproofing, permit and management. Tile, vanities, fixtures and glass are added as your selections.

How much does it cost to replace just a shower? After the project review, your written proposal lists the following scope and pricing: A shower replacement with demolition, pan, waterproofing, tile and glass typically for a 3x5 to 4x6 ft shower.

How long does a bathroom renovation take? A master bath is scheduled in your written proposal. Timing is confirmed in your written proposal. Layout changes, permits and special-order materials can add time.

Do I need a permit to remodel a bathroom in Florida? Most remodels that touch plumbing, electrical, waterproofing or the shower require a permit. We pull it and include it in our pricing.

What is the most expensive part of a bathroom remodel? Moving plumbing and building custom showers usually cost the most, followed by high-end materials like slabs, stone and frameless glass.

Can I save money by keeping my tub? Yes. Keeping the tub and layout avoids demolition and plumbing changes. Many guest bath remodels keep the tub and update tile, vanity and fixtures.

Free Project Review

Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.

Extraordinary spaces. A thoughtful first step.

Share your vision for your South Florida home.

Book My Free Project Review

Free project review · (561) 556-7509

Extraordinary Spaces architectural design concept