Shower Renovation and Installation in South Florida: Leaks, Walk-In Showers and Cost

Request a Free Project Review
FL CERTIFIED GC ·CGC1540699
150+Projects Completed
Free Project ReviewBook yours today
WorkmanshipWarranty

By John Perry

Is your shower pan leaking? Water stains on the ceiling below, grout that turns dark and never dries, loose tiles, a musty smell, or a soft spot on the floor outside the shower? Those are the classic signs that water is getting where it shouldn't, and in a shower, the problem is almost always under or behind the tile.

A shower looks like tile and glass, but what keeps your home dry is the system you never see: the slope, the pan, the waterproofing and the drain. This guide explains how a shower is built right, how to spot one that's failing, the options for walk-in and curbless showers, and what a shower renovation costs in South Florida.

Signs your shower is failing

Shower leak signs infographic

  • Water stains on the ceiling below (second floors and condos) or on the baseboard outside the shower
  • Grout that stays dark long after the shower is dry
  • Cracked or loose tiles, especially on the floor and lower walls
  • Timing is confirmed in your written proposal.
  • Soft or spongy floor next to the shower
  • Efflorescence (white powder) in the grout
  • Peeling paint or bubbling drywall on the wall behind the shower

If you're seeing these, regrouting or caulking only hides the problem for a few months. The pan or the wall waterproofing has failed and needs to be rebuilt. See shower pan replacement cost and shower regrout vs replace.

Linear shower drain and sloped mortar bed before tile installation

The Owner's Guide to Bathrooms and Showers

The technical detail behind a bathroom built to stay watertight: waterproofing and flood tests, shower slopes, tile and stone, vanities, glass, permits, condo rules and how to compare bathroom quotes.

+ Free one-page checklist: Before You Remodel Your Bathroom

Why South Florida showers fail

  1. No pre-slope under the liner. Water that reaches the liner sits there instead of draining, and the mortar bed stays wet for years.
  2. Weep holes clogged with mortar, so trapped water can't reach the drain.
  3. Flat or backward slope that lets water puddle against the curb or walls.
  4. Tile set on regular drywall or green board with no waterproofing.
  5. Liner punctured by nails or screws at the curb.
  6. No flood test before tiling, so a leak isn't found until it's behind finished tile.
  7. Grout used in corners instead of flexible sealant, cracking with movement.
Free Project Review

Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.

How we build a shower that doesn't leak

Shower layers cross section infographic

  1. Demolition down to the studs and slab or subfloor; inspection for rot and water damage.
  2. Framing and blocking for niches, benches, grab bars and glass.
  3. Pre-slope built by hand, sloping 1/4" per foot to the drain, so any water that gets past the tile runs to the drain.
  4. Waterproofing system. We use different systems based on the size and design of the project: a traditional PVC liner with a clamping drain and weep-hole protection, or bonded sheet or liquid membranes for curbless and linear-drain showers.
  5. Flood test. The pan is filled with water and left; checked for any drop before anything else is built. Timing is confirmed in your written proposal. We flood-test every shower pan.
  6. Mortar bed (for liner systems) sloped to the drain, or tile set directly over the bonded membrane.
  7. Walls: cement board or waterproof boards, seams treated, waterproofing on walls, niches and benches.
  8. Tile with the right mortar and full coverage. Mosaics or textured tile on the floor for grip; large format or slabs on the walls.
  9. Grout and sealant: epoxy or urethane grout, flexible sealant at all inside corners and changes of plane.
  10. Glass, fixtures and trim, coordinated with licensed plumbers and glass installers.

Walk-in, curbless and tub-to-shower

Walk-in showers

The most requested upgrade. A low curb or no curb, a large glass panel, a niche and a bench. They feel bigger, look modern, and are easier to clean.

Curbless showers

No step at all, so the bathroom floor flows into the shower. They need:

  • the shower floor recessed into the slab or the bathroom floor built up
  • a linear drain or careful slope planning
  • a bonded waterproofing membrane that extends beyond the shower area
  • glass planned so water stays in

They're perfect for aging in place and for a seamless high-end look. See ADA bathroom renovation.

Tub-to-shower conversions

Taking out an unused tub for a walk-in shower is one of the best bathroom upgrades in South Florida homes. The drain moves, the alcove gets a full shower pan and waterproofing, and the space gains a niche and glass. See tub to shower conversion cost.

Linear drain or center drain?

Center drainLinear drain
SlopeFour-way slope to the centerOne-way slope to the drain
TileSmaller tiles or mosaics on the floorAllows large-format tile on the floor
LookTraditionalModern, clean
CurblessPossibleIdeal
CostLowerHigher

Shower walls: tile, large format or slabs

  • Standard tile (12x24, subway): classic and cost-effective.
  • Large-format porcelain (24x48): fewer grout lines, modern.
  • Porcelain slabs: two or three seams for the whole shower, almost no grout to clean. See stone slab installation.
  • Marble: luxury, needs sealing and pH-neutral cleaning.
  • Mosaic accents for niches and feature strips.

Shower renovation cost in South Florida (2026)

Starting prices including labor, setting materials, waterproofing, permit and management. Tile, fixtures and glass are your selections and are listed separately. Final pricing is confirmed after we see the shower.

ScopeStarting from
Shower pan replacement onlysee shower pan replacement cost

What pushes the price up: curbless construction, linear drains, moved drains, steam showers, multiple shower heads and body sprays, heavy frameless glass, natural stone, and damage found behind the walls.

How long a shower renovation takes

ProjectTypical time
Shower replacement, same locationTiming is confirmed in your written proposal.
Tub-to-shower conversionTiming is confirmed in your written proposal.
Curbless shower with linear drainTiming is confirmed in your written proposal.
Glass enclosure after tileTiming is confirmed in your written proposal.

The flood test, mortar cure and glass fabrication are the steps that set the schedule. Skipping them is how showers end up leaking.

Shower renovation in condos

In a condo, a shower leak becomes your neighbor's ceiling. Associations usually require:

  • approval of the scope and contractor
  • insurance certificates
  • licensed plumbing work and a permit
  • strict waterproofing, sometimes with inspection

We document the waterproofing and flood test with photos for your records and the association.

Keeping your new shower in great shape

  • Squeegee the walls and glass after each use.
  • Run the exhaust fan during and 20–30 minutes after showering.
  • Clean with pH-neutral products; avoid acids on marble and cement grout.
  • Recaulk inside corners when the sealant starts to separate.
  • Keep the drain clear of hair and soap buildup.

Shower niches and benches built right

Niches and benches are where many showers start leaking, because they create extra corners and horizontal surfaces:

  • Niches should be framed between studs, fully waterproofed on every surface, and sloped slightly forward so water doesn't sit on the shelf.
  • Benches need a solid structure (framed and boarded, or built in masonry), full waterproofing tied into the wall and pan system, and a slight slope toward the drain.
  • Ledges and window sills inside showers need the same slope and waterproofing, and windows in showers need special flashing.

Glass: the last step, planned from the start

Frameless glass is measured after tile is complete; fabricated and installed. Timing is confirmed in your written proposal. But it needs to be planned at the beginning:

  • blocking in the walls for hinges and clamps
  • curb or no-curb design and where the panel sits
  • a sweep or threshold detail to keep water in
  • the door swing clearing the vanity and toilet

Shower valves and fixtures

The shower valve is installed inside the wall before tile, so choose your fixtures early. A thermostatic valve keeps the temperature steady, and diverters let you switch between rain head, hand shower and body sprays. Plumbing work is done by licensed plumbers that we coordinate as the general contractor.

Shower ideas for South Florida homes

  • Walk-in with a single fixed glass panel and no door, for an open feel
  • Matching floor and shower tile for continuity
  • Two shower heads (rain head plus handheld) on a thermostatic valve
  • Long horizontal niche across the back wall with LED lighting
  • Floating bench in matching slab or tile
  • Outdoor shower near the pool, built with exterior-rated tile and drainage

Why we flood-test every shower

it's the one test that proves the pan holds water before tile hides it. Timing is confirmed in your written proposal. Showers that skip it are the ones we tear out a few years later.

A shower built right should stay dry and solid for decades; that's the standard we build to.

Where we build showers

We renovate showers across Broward, Palm Beach and Miami-Dade, including Boca Raton, Delray Beach, Fort Lauderdale, Parkland, Coral Springs, Weston, Lighthouse Point, Pompano Beach, Jupiter and Miami, in homes and condos.

Shower niches and benches

  • place niches on a wall that doesn't face the door, at a comfortable height
  • size them to the tile so cuts are clean
  • slope the bottom of the niche so water drains out
  • build benches into the waterproofed shower system, never as an add-on afterward
  • consider a floating bench for a lighter look and easier cleaning underneath

Niches and benches are waterproofed as part of the shower, so they never become weak spots.

Glass enclosures

Frameless glass is measured after tile is finished, so templates match the final walls exactly.

Get a price for your shower

Send us photos of your shower and any leak signs, or call (561) 556-7509. We'll inspect it, explain what's failing. Send us your plans and we'll prepare a written proposal. J. Perry & Sons is a licensed Florida general contractor (CGC1540699). We pull our own permits, flood-test every shower pan, and back our work with a workmanship warranty.


Next step

Send us a photo of the look you want and a photo of your house. We'll tell you what it's called, how we'd build it and the starting price.

Free Project Review. We look at your project with you and tell you what's possible and a starting price.

Call (561) 556-7509

By submitting, you agree that J. Perry & Sons may contact you by phone, text or email about your project.

Make room for your daily retreat.

Let's create a bathroom that brings calm to every day.

Plan My Bathroom

Free project review · (561) 556-7509

Bathroom architectural design concept

FAQ

How do I know if my shower pan is leaking? Water stains on the ceiling below or on nearby baseboards, grout that stays dark, loose floor tiles, and a musty smell are common signs. A plumber's leak test or a flood test confirms it.

How much does a shower renovation cost in South Florida? A full shower replacement typically starts at $13,500, including demolition, pan, waterproofing, tile and glass coordination, permit and management. Material selections are added.

Can a leaking shower be fixed without removing the tile? Sometimes a leak is only at the valve or a failed corner sealant. When the pan or wall waterproofing has failed, the tile has to come out to rebuild it properly.

What is a flood test? After the pan and waterproofing are built, the shower floor is filled with water and left; to confirm there are no leaks before tile is installed. Timing is confirmed in your written proposal.

Are curbless showers more expensive? Yes. They need the floor recessed or built up, a linear drain or special slope, and a larger waterproofed area.

How long does a shower remodel take? Timing is confirmed in your written proposal.

Do you install shower glass? We coordinate frameless glass, measured after tile is complete and installed when fabricated. Timing is confirmed in your written proposal.

Free Project Review

Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.

Extraordinary spaces. A thoughtful first step.

Share your vision for your South Florida home.

Book My Free Project Review

Free project review · (561) 556-7509

Extraordinary Spaces architectural design concept