By John Perry
Is your shower pan leaking? Water stains on the ceiling below, grout that turns dark and never dries, loose tiles, a musty smell, or a soft spot on the floor outside the shower? Those are the classic signs that water is getting where it shouldn't, and in a shower, the problem is almost always under or behind the tile.
A shower looks like tile and glass, but what keeps your home dry is the system you never see: the slope, the pan, the waterproofing and the drain. This guide explains how a shower is built right, how to spot one that's failing, the options for walk-in and curbless showers, and what a shower renovation costs in South Florida.

If you're seeing these, regrouting or caulking only hides the problem for a few months. The pan or the wall waterproofing has failed and needs to be rebuilt. See shower pan replacement cost and shower regrout vs replace.

The technical detail behind a bathroom built to stay watertight: waterproofing and flood tests, shower slopes, tile and stone, vanities, glass, permits, condo rules and how to compare bathroom quotes.
+ Free one-page checklist: Before You Remodel Your Bathroom
Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.

The most requested upgrade. A low curb or no curb, a large glass panel, a niche and a bench. They feel bigger, look modern, and are easier to clean.
No step at all, so the bathroom floor flows into the shower. They need:
They're perfect for aging in place and for a seamless high-end look. See ADA bathroom renovation.
Taking out an unused tub for a walk-in shower is one of the best bathroom upgrades in South Florida homes. The drain moves, the alcove gets a full shower pan and waterproofing, and the space gains a niche and glass. See tub to shower conversion cost.
| Center drain | Linear drain | |
|---|---|---|
| Slope | Four-way slope to the center | One-way slope to the drain |
| Tile | Smaller tiles or mosaics on the floor | Allows large-format tile on the floor |
| Look | Traditional | Modern, clean |
| Curbless | Possible | Ideal |
| Cost | Lower | Higher |
Starting prices including labor, setting materials, waterproofing, permit and management. Tile, fixtures and glass are your selections and are listed separately. Final pricing is confirmed after we see the shower.
| Scope | Starting from |
|---|---|
| Shower pan replacement only | see shower pan replacement cost |
What pushes the price up: curbless construction, linear drains, moved drains, steam showers, multiple shower heads and body sprays, heavy frameless glass, natural stone, and damage found behind the walls.
| Project | Typical time |
|---|---|
| Shower replacement, same location | Timing is confirmed in your written proposal. |
| Tub-to-shower conversion | Timing is confirmed in your written proposal. |
| Curbless shower with linear drain | Timing is confirmed in your written proposal. |
| Glass enclosure after tile | Timing is confirmed in your written proposal. |
The flood test, mortar cure and glass fabrication are the steps that set the schedule. Skipping them is how showers end up leaking.
In a condo, a shower leak becomes your neighbor's ceiling. Associations usually require:
We document the waterproofing and flood test with photos for your records and the association.
Niches and benches are where many showers start leaking, because they create extra corners and horizontal surfaces:
Frameless glass is measured after tile is complete; fabricated and installed. Timing is confirmed in your written proposal. But it needs to be planned at the beginning:
The shower valve is installed inside the wall before tile, so choose your fixtures early. A thermostatic valve keeps the temperature steady, and diverters let you switch between rain head, hand shower and body sprays. Plumbing work is done by licensed plumbers that we coordinate as the general contractor.
it's the one test that proves the pan holds water before tile hides it. Timing is confirmed in your written proposal. Showers that skip it are the ones we tear out a few years later.
A shower built right should stay dry and solid for decades; that's the standard we build to.
We renovate showers across Broward, Palm Beach and Miami-Dade, including Boca Raton, Delray Beach, Fort Lauderdale, Parkland, Coral Springs, Weston, Lighthouse Point, Pompano Beach, Jupiter and Miami, in homes and condos.
Niches and benches are waterproofed as part of the shower, so they never become weak spots.
Frameless glass is measured after tile is finished, so templates match the final walls exactly.
Send us photos of your shower and any leak signs, or call (561) 556-7509. We'll inspect it, explain what's failing. Send us your plans and we'll prepare a written proposal. J. Perry & Sons is a licensed Florida general contractor (CGC1540699). We pull our own permits, flood-test every shower pan, and back our work with a workmanship warranty.
Let's create a bathroom that brings calm to every day.
Free project review · (561) 556-7509

How do I know if my shower pan is leaking? Water stains on the ceiling below or on nearby baseboards, grout that stays dark, loose floor tiles, and a musty smell are common signs. A plumber's leak test or a flood test confirms it.
How much does a shower renovation cost in South Florida? A full shower replacement typically starts at $13,500, including demolition, pan, waterproofing, tile and glass coordination, permit and management. Material selections are added.
Can a leaking shower be fixed without removing the tile? Sometimes a leak is only at the valve or a failed corner sealant. When the pan or wall waterproofing has failed, the tile has to come out to rebuild it properly.
What is a flood test? After the pan and waterproofing are built, the shower floor is filled with water and left; to confirm there are no leaks before tile is installed. Timing is confirmed in your written proposal.
Are curbless showers more expensive? Yes. They need the floor recessed or built up, a linear drain or special slope, and a larger waterproofed area.
How long does a shower remodel take? Timing is confirmed in your written proposal.
Do you install shower glass? We coordinate frameless glass, measured after tile is complete and installed when fabricated. Timing is confirmed in your written proposal.
Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.
Share your vision for your South Florida home.
Free project review · (561) 556-7509
