After the project review, your written proposal lists the following scope and pricing: Tiling a Miami Beach condo floor in porcelain starts at $20 per sq ft installed, and shower walls with setting materials. Our crews set floors, showers, backsplashes and balconies, and we deal with the building's sound-mat rule and elevator schedule. Call (561) 556-7509. Details on methods are on tile installation; other services on the island are on Miami Beach renovation contractor.
Balconies: the Miami Beach tile job that needs the most care
Ocean-facing balconies take wind-driven rain, salt and full sun, and the tile on them sits directly over the structural slab of the building. When a balcony is retiled, the waterproofing under the tile matters more than the tile. Many Miami Beach buildings are also going through milestone inspections and concrete restoration, and balconies are often where repairs happen first. After the association's concrete contractor finishes, unit owners are told to retile.
Our approach: remove the old tile and mortar down to the slab, confirm the slope to the drain or edge, apply a waterproofing membrane rated for exterior use under tile, and set a porcelain with a slip-resistance rating suitable for wet areas. Movement joints go at the perimeter and at the door threshold. The building usually dictates the tile color and thickness so balconies match from the street.
Miami Beach tile prices
| Tile work | Typical area | Installed range |
|---|---|---|
| Porcelain floor, 12x24 or 18x18 | 800–1,800 sq ft | Starting at $20 per sq ft |
| Large-format floor, 24x48 and up | 800–2,000 sq ft | Starting at $30 per sq ft |
| Wood-look porcelain plank | 600–1,500 sq ft | Starting at $20 per sq ft |
| Marble or natural stone tile | 300–1,200 sq ft | Starting at $20 per sq ft |
| Remove old tile and thinset | any | Starting at $20 per sq ft |
Tile is supplied by you unless agreed otherwise. Balcony waterproofing and sound underlayment are priced from the products your building approves.
Free Project Review — call (561) 556-7509 or send us your project through our project form. Send a photo of the area, the building name and rough size. We review every project personally and follow up with you directly.
Inside the unit: floors and showers
Sound control. Most Miami Beach associations require an acoustic underlayment under new tile, with a minimum rating in the building rules. It goes down before the tile, and managers often inspect it. We submit the product and schedule that inspection.
Large format on concrete. 24x48 porcelain is popular in tower units with floor-to-ceiling windows. Post-tensioned slabs are usually close to flat, but old mortar beds leave humps. We grind and level before setting, with leveling clips and full mortar coverage.
Showers without windows. Interior bathrooms in towers are humid. Bonded membranes, high-performance grout and silicone at every inside corner keep mildew out of the joints.
Older buildings. Art Deco-era units in South Beach sometimes have terrazzo or old mud-set tile. Removing mud-set tile is heavy, dusty work; we use vacuum-shrouded tools and haul debris out in sealed bags.
Our tile process on Miami Beach
- Survey the space, check flatness and read the association's renovation rules.
- Submit the board package: scope, underlayment or membrane specs, insurance.
- Protect common areas and book the elevator.
- Demolish in permitted hours and level the slab.
- Install underlayment or waterproofing, then set tile from a layout line.
- Grout, caulk, clean and walk the job with you.
Workmanship warranty on every job; materials carry the manufacturer's warranty. Terms are in your written contract.
Related services in Miami Beach
- Bathroom renovation in Miami Beach
- Flooring installation in Miami Beach
- Kitchen renovation in Miami Beach
- Stone slab installation in Miami Beach
- Floor leveling in Miami Beach
- Pavers in Miami Beach
- Stone veneer in Miami Beach
Nearby service areas
- Tile installation in Miami
- Tile installation in Aventura
- Tile installation in Coral Gables
- Home tile work in Miami
- Renovation across Miami-Dade County
Planning guides: Balcony waterproofing under tile · Milestone inspections and your renovation · Best tile for Florida homes
From large-format porcelain to natural stone, set right from the slab up.
Free project review · (561) 556-7509

Tile installation in Miami Beach — FAQ
My building finished concrete repairs. Can you retile the balcony now? Yes. We confirm the repaired slab is cured and sloped, install an exterior waterproofing membrane and set the tile the association specifies.
What does my Miami Beach condo require before new tile floors? Usually a scope letter, our license and insurance, and an acoustic underlayment that meets the building's rating. Some buildings inspect the underlayment before tile. A city permit is rarely needed for floor tile alone.
How long will tile work take in my unit? A 1,000 sq ft floor with demo and leveling. Timing is confirmed in your written proposal.
Which tile finish is best near the beach? Matte or textured porcelain. It hides sand scratches, and it is safer when feet are wet. Save polished finishes for rooms away from the entry and balcony.
How do I get an exact price? Call (561) 556-7509 or send us your project through our project form with photos, square footage and the building name. After a visit to check the slab and the building's rules, we send a written price per area.
Free Project Review — call (561) 556-7509 or send us your project through our project form. Licensed Florida general contractor CGC1540699. Serving Broward, Palm Beach and Miami-Dade counties.


