After the project review, your written proposal lists the following scope and pricing: Parkland kitchen remodels start at $28,000: a refresh starts at $28,000, and most remodels when the layout stays and the cabinets, quartz tops, backsplash and floor are new. After the project review, your written proposal lists the following scope and pricing: Moving walls, plumbing or the island pushes it to or more. We run the whole job, permits included, as part of our kitchen renovation work. Call (561) 556-7509.
A lot of Parkland kitchens share a look: raised-panel wood cabinets, speckled granite, an island too small for the room, and a soffit over the uppers. The rooms themselves are generous. That gives a remodel more room to work with than in older Broward houses, and it is why so many owners here go beyond a refresh. We are also a renovation contractor in Parkland for the bathrooms and floors that often follow.
Renovating in Parkland
Renovating in Parkland: what's different here
The City of Parkland issues permits inside city limits; unincorporated areas go to Broward County. Broward is in the High-Velocity Hurricane Zone, so exterior products need a Miami-Dade NOA or HVHZ approval, usually requested with frame color and glass details.
Parkland is mostly larger single-family homes in gated HOA communities, plus estate lots. Pavers, pool decks, paint colors, windows and doors, stone veneer and outdoor living go through architectural review.
Committees commonly want a survey with the work drawn on it, setbacks, drainage, physical samples and a rendering. Larger outdoor projects often need drawings, and anything structural needs a licensed architect or engineer; we plan the work and coordinate with them. Many communities have a master association and a sub-association that both review. Planning around the committee calendar keeps the start date on track.
Three levels of kitchen work, priced for Parkland
After the project review, your written proposal lists the following scope and pricing: | Level | What it covers | Installed range | |---|---|---| | Refresh | New countertops, backsplash, sink, faucet, paint | | | Full remodel, same layout | New cabinets, quartz, backsplash, floor | | | Layout change | Moved plumbing and electrical, new island, lighting | | | Island added | Cabinets, top, electrical | | | Countertops only, quartz or granite | 45–70 sq ft | | | Kitchen floor, porcelain with demo | 150–250 sq ft | |.
Appliances are yours to choose; we install them and coordinate the delivery dates.
Free Project Review — call (561) 556-7509 or send us your project through our project form. Send photos of the kitchen and a rough sketch. We review every project personally and follow up with you directly.
Decisions Parkland owners face first
Keep the layout or open it up? Many homes here have a breakfast nook, a desk alcove and a wall between kitchen and dining room. Removing the desk or the nook is simple. Removing a wall may not be. If it carries load, engineering is done by a licensed engineer, and we build to the engineer's drawings and pull the permit.
Cabinets to the ceiling. Taking down the soffit over the upper cabinets and running cabinets to a 10 ft ceiling is one of the biggest visual changes for the money. We check what is inside the soffit first, because ducts and plumbing vents sometimes live there.
One island or two? In the largest kitchens, a working island with the sink and a second one for seating can fit. Most need about 42 in of aisle around each.
Floor first or cabinets first? If the whole first floor is being replaced, we lay the new floor under the cabinet footprint too so a future layout change does not leave gaps.
Parkland permits, HOA rules and timing
Kitchen remodels with new electrical, plumbing or walls need a building permit from the City of Parkland. We pull it under our general contractor license, CGC1540699, and schedule the inspections. Interior work generally does not need HOA approval, but most communities have contractor rules: working hours, vehicle passes at the gate, and dumpster placement. We set those up with the management office before demo.
Timing is based on cabinets more than anything. Semi-custom lines take four to eight weeks to arrive. We measure, order, and do not tear out your kitchen until the cabinets have a confirmed ship date. Living at home through it is normal here; we set up a temporary sink area if you want one.
How a Parkland kitchen job runs
- Design meeting and measurements; cabinet and finish selections.
- Written quote by trade; permit drawings if the layout changes.
- Cabinet order placed; permit submitted.
- Demo, then plumbing, electrical and wall changes with rough inspections.
- Drywall, floor, cabinets, then template and install of the tops.
- Backsplash, paint, fixtures, appliances; final inspection and walk-through.
Related services in Parkland
Planning guides: Kitchen remodel cost · Kitchen remodel timeline · Kitchen island addition cost
Considered layouts. Beautiful materials. A space that feels like you.
Free project review · (561) 556-7509

FAQ
Do I need a permit to remodel my kitchen in Parkland?
If you change electrical, plumbing, gas or walls, yes, through the City of Parkland. A countertop and backsplash swap with no new circuits usually does not. We pull the permit whenever the scope calls for one.
How long will we be without a kitchen?
The schedule is set in your written proposal. Ordering cabinets before demo keeps the gap as short as possible.
Can you remove the wall between my kitchen and family room?
Often, if it is not bearing or if an engineer designs a beam for it. We open a small inspection hole first and bring in a licensed engineer when the wall carries load.
Does the HOA have to approve my kitchen?
Not the design, since it is inside. The community will still have rules for contractor access, hours and dumpsters, and we coordinate those with the office.
How do I get an exact price?
Call (561) 556-7509 or send us your project through our project form with photos and a sketch. We review every project personally and follow up with you directly.


