Condo Building Painting: What Your Board Should Specify Before It Bids

By J. Perry & Sons ·

FL CERTIFIED GC ·CGC1540699
150+Projects Completed
Free Project ReviewBook yours today
WorkmanshipWarranty

Every board that has repainted a building knows the moment: three bids arrive so far apart they could be for three different buildings. Usually they are. One bidder priced full crack repair and two coats of elastomeric. Another priced "prep as needed" and one coat. The third left the balconies, railings and sealants out entirely.

The board cannot fix that by negotiating. It fixes it by writing the spec first. When every contractor prices the same scope, the bids become comparable, the choice is easy to explain to owners and the building gets a repaint that actually lasts.

This guide is written for condo and HOA board members in South Florida. It covers what to decide before you ask for bids, the spec checklist we recommend, and how to compare condo painting bids line by line.

Why the spec matters more than the price

A condo repaint is not really a paint job. It is the last step of a building envelope repair. On a stucco building near the coast, the coating sits on top of cracks, sealant joints, balcony edges and metal railings, and every one of those can fail on its own.

If the spec only says "paint the building," each bidder decides for you how much of that work to include. The low bid is often the one that left the most out. Six months later the board sees cracks telegraphing through the new coating, rust bleeding from railing bases and blisters where water got behind the stucco.

A written spec takes those decisions back. The board, with its engineer and manager, decides what the job includes. The contractors only price it.

Start with the engineer, the milestone and the reserve study

Before anyone talks about color, look at what your building already has on paper.

  • Milestone inspection or recertification report. If your engineer has listed concrete, balcony or structural repairs, those must happen before paint. The repaint should be planned around that report, not next to it.
  • Structural integrity reserve study. For buildings three stories and taller, Florida's reserve study rules include waterproofing and exterior painting among the items the association plans and reserves for. The repaint belongs in that conversation.
  • Last repaint records. Product names, colors, coats and any problems from the last cycle tell the next contractor a lot.

The best time to bring a painting contractor in is while those documents are being prepared, so the reserve number reflects the real condition of the walls. Confirm the specific requirements for your building with your engineer and your association's attorney.

The order of work: repairs before paint

This is the single most important line in any condo painting spec. The order should be:

  1. Concrete and balcony repairs from the engineer's report: spalling, exposed rebar, slab edges, railing bases.
  2. Stucco and cracks: sound the walls, cut out hollow stucco, open and fill moving cracks.
  3. Sealants and expansion joints: remove failed sealant at windows, sliders, joints and penetrations, and install new.
  4. Pressure cleaning: remove dirt, mildew, chalk and salt; treat mildew.
  5. Primer and finish coats: masonry primer on patched and new areas, then the finish system.

Painting before repairs is the most expensive mistake a board can make. The coating gets cut open for repairs, patches never match and access equipment has to be set up twice. When the engineer's repairs and the repaint go out as one bid package, one contractor sequences it, one access setup serves both and the board manages one schedule.

The condo painting spec checklist

Use this list as the backbone of your bid package. Each line should be written into the spec so every bidder answers it the same way.

Scope and building

  • Number of stories and elevations; balconies, breezeways, stairwells, garage, amenities and pool areas included or excluded.
  • Surfaces by type: stucco walls, bands and trim, soffits, concrete, metal railings, doors and frames.

Surface prep

  • Pressure cleaning method and mildew treatment for every elevation.
  • Wall sounding and marking of cracks and hollow areas before repair.

Repairs (priced as unit prices)

  • Hairline crack treatment, moving-crack repair, stucco patch and replacement, concrete spall repair, each with a unit price.
  • An estimated quantity from the survey, with actual quantities measured and approved as the work goes.

Sealants

  • Window and slider perimeters, expansion joints, wall penetrations and storefronts: replace, touch up or exclude, and the sealant type compatible with the coating.

Coating system

  • Primer, finish coat product names, number of coats and the film thickness from the manufacturer's data sheet.
  • Elastomeric or high-performance acrylic, chosen for your walls (see below).

Metals and railings

  • Rust removal, metal primer or direct-to-metal coating, and finish.

Access and safety

  • Access method by elevation (lifts, swing stage or rope access), roof anchor documentation, controlled zones below.

Protection

  • Cars, pool deck, landscaping, windows, sliders, balcony floors and lobby entrances.

Residents

  • Notice schedule, balcony-clearing requests, who sends notices and one contact for questions.

Inspections and closeout

  • Inspection points (after repairs, cleaning, primer and finish), film-thickness readings, manufacturer field inspection where offered, punch list walk, color schedule, touch-up stock and closeout documents.

Paperwork

  • Active license, certificate of insurance naming the association as required, and permits pulled for any repair work that needs one.

Choosing the coating system

Most condo buildings in South Florida end up with one of two finish systems.

Elastomeric coating is a thick, flexible film that stretches over hairline cracks and sheds wind-driven rain. It is the usual choice on older stucco with fine cracking and on elevations that take direct weather. The film thickness the manufacturer calls for is what makes it work, so the spec should name it and the contractor should measure it.

High-performance acrylic is thinner and breathes more. It suits sound walls, buildings that were coated with acrylic before and areas where an easier future repaint matters.

The wrong choice is usually made by default: putting elastomeric over a wall with moisture trapped behind it, or putting a thin coat on a wall full of cracks. Ask your contractor to recommend the system after the wall survey, and to show you the product data sheet.

Railings, doors and frames need their own system. Near the water, rust starts at every scratch, so metals should be cleaned to sound metal, primed and finished with a coating made for coastal exposure.

Access on a condo tower: what to ask

On a high-rise, access can be one of the largest items in the bid, and it is where bids differ most. There are three methods, and many buildings use more than one:

  • Lifts for low-rise walls with open ground below.
  • Swing stage for tall, flat elevations with large repair areas.
  • Rope access for towers, curved or broken facades and tight sites.

Ask each bidder which method they will use on each elevation and why. Ask who provides the roof anchor documentation, how the area below is protected, how tools are tethered and when work stops for wind and lightning. A contractor experienced in high rise painting will answer in writing. For how we handle it, see our high-rise and condo painting service.

Color: who approves it and how

Your declaration and bylaws decide whether the board can choose the exterior color or whether a change needs an owner vote. Check before you schedule a color meeting.

Either way, approval goes better with three things: sample boards in the real colors, a color schedule showing which color goes on walls, bands, trim, railings and doors, and a mockup on the building itself so owners see the color in South Florida light. Get the final approval in writing before the finish coat starts.

Keeping owners informed

The board's phone rings when residents are surprised. Build communication into the spec:

  • Notices before every phase, naming the elevation and what residents need to do.
  • Balcony clearing, window and slider instructions, and parking and pool closures.
  • One contact for questions, so the manager is not the only line.
  • A short closeout note with the colors used.

Informed owners mean fewer complaints at board meetings.

How to compare bids line by line

Once the bids are in, do not start with the total. Put every bid into the same grid and compare it line by line.

  1. Make one row for every spec line: prep, each repair unit price, sealant scope, coating products, coats and film thickness, metals, access by elevation, protection, notices, inspections, closeout, license and insurance.
  2. Mark each bidder against each row: included as specified, included with a change, or excluded. Changes and exclusions are where the price difference usually lives.
  3. Compare repair unit prices, not repair allowances. An allowance can look low and then run over. Unit prices follow what is actually found.
  4. Check the coating products and film thickness. Two coats at the data-sheet thickness is a different job from one coat of a different product.
  5. Check the access plan. A bid that does not say how each elevation is reached has not been fully priced.
  6. Read the exclusions out loud at the board meeting. If balconies, railings or sealants are excluded, the board needs to know before it votes.
  7. Verify license and insurance for every bidder before the vote, not after.

Red flags: "prep as needed" with no detail, no repair unit prices, no product names, no access method and no exclusions list. A bid with no exclusions usually has them; they just are not written down.

The same rules apply to HOA and commercial exterior painting

Townhome communities, office buildings and retail centers follow the same logic. Commercial exterior painting still starts with stucco and concrete repair, then sealants, cleaning, primer and paint. The differences are in the logistics: tenants instead of owners, business hours instead of balconies, and an owner or manager approving instead of a board. When you compare commercial painting companies for those buildings, use the same spec and the same grid. Our commercial painting page covers how we run those projects.

Next step: a Free Project Review

J. Perry & Sons paints condo and commercial buildings across South Florida, up to about 20 stories, with our own rope-access crews. We repair stucco and concrete, replace sealants and pressure clean before we paint, we pull the permits our work needs, and we have completed 150+ projects. We are a licensed Florida general contractor (CGC1540699).

Send us your engineer's or milestone report, photos of each elevation and your last repaint records. In a Free Project Review we will tell your board what the repaint should include and what the spec should say, before anyone prices it. Call (561) 556-7509 or send us your project.

Free Project Review

By submitting, you agree that J. Perry & Sons may contact you by phone, text or email about your project.

Related: High-rise and condo painting · Commercial painting · Balcony repair · Commercial building caulking · Pressure cleaning for buildings · Milestone inspection guide for condo boards

Frequently asked questions

What should a condo board decide before asking for painting bids?

Decide the scope in writing: the order of work, which repairs are priced as unit prices, the sealant scope, the coating system with coats and film thickness, metals, access, protection, resident notices and closeout. Line up the engineer's report and reserve study first. When every bidder prices the same written scope, the board can compare bids fairly and explain its choice to owners.

Why do condo painting bids vary so much?

Because bidders are usually pricing different jobs. One includes full crack and stucco repair, sealant replacement and two coats; another prices one coat with "prep as needed"; a third excludes balconies and railings. Access methods also differ. A written spec and a line-by-line comparison grid show where the difference is, so the board compares the work, not just the totals.

Should balcony and concrete repairs be done before the building is painted?

Yes. Concrete and balcony repairs from the engineer's report should be finished before stucco, sealants, cleaning and paint. Painting first means cutting into new coating for repairs, patches that do not match and access set up twice. Bidding the repairs and the repaint as one package lets one contractor sequence the work and use one access setup for both.

Does the board choose the exterior color, or do owners vote?

Your declaration and bylaws decide. Some associations let the board choose, and others require an owner vote for a change. Check your documents and your attorney's advice before the color meeting. Either way, sample boards, a color schedule and a mockup on the building make approval easier, and the final color should be approved in writing.

What is the difference between condo painting and commercial exterior painting?

The building work is the same: repairs, sealants, cleaning, primer and paint, in that order. The difference is who is affected and who approves. Condo painting works around residents and balconies with board or owner approval. Commercial exterior painting works around tenants and business hours with the owner or manager approving. The spec checklist works for both.

What should we send a painting contractor for a first review?

Send your engineer's or milestone report, the reserve study line for painting and waterproofing, photos of each elevation, the number of stories and your last repaint records. If the board has a draft spec, include it. With those, a contractor can tell you what the repaint should include, which repairs to expect and which access method fits your building.