Bathroom Floor Replacement in South Florida: Process, Options and Cost (2026)

Request a Free Project Review
FL CERTIFIED GC ·CGC1540699
150+Projects Completed
Free Project ReviewBook yours today
WorkmanshipWarranty

By John Perry

Cracked tiles around the toilet? Grout that stays dark no matter how much you scrub? A soft spot or a musty smell that won't go away? The bathroom floor takes more water, cleaning chemicals and weight than any other floor in the house, and when it starts to fail, it's worth fixing properly.

Replacing a bathroom floor is a small project with big details: the toilet, the vanity, the shower or tub edge, waterproofing and slope. Here's how it's done right and what it costs in South Florida.

Signs your bathroom floor needs replacing

  • Cracked or loose tiles, especially around the toilet and tub.
  • Grout that crumbles or stays stained after cleaning.
  • A soft or spongy feel (common on wood-framed upper floors).
  • Musty smell or dark stains at the base of the toilet or along the tub, which can signal a slow leak.
  • Water stains on the ceiling below in two-story homes and condos.
  • An outdated look: small beige tiles, pink or blue 1980s tile, or vinyl.

If there are signs of a leak, the source has to be found and fixed before the new floor goes in, or the new floor will fail the same way.

Sage vanity with granite countertop

Floor only, or the whole bathroom?

A floor-only replacement makes sense when the shower, tub and vanity are in good shape. Many clients find that once the floor is out, it's the right moment to also:

  • replace the vanity (it has to come out anyway if the new floor goes under it)
  • replace the toilet
  • convert the tub to a walk-in shower, see tub to shower conversion
  • extend the floor tile into a new shower for a seamless look

We price it both ways so you can decide.

Free Project Review

Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.

How a bathroom floor replacement works

Bathroom Floor Replacement, Step by Step

  1. Protection. Dust barrier at the door, protection for the tub, shower and vanity if they stay.
  2. Remove fixtures. Toilet removed and the drain capped. Vanity removed or protected, based on the plan.
  3. Remove the old floor down to the slab or subfloor, including old mortar. See tile removal and replacement.
  4. Inspect. Check the slab or subfloor for cracks, rot, soft spots and signs of past leaks around the toilet flange and tub.
  5. Repair and prepare. Repair the subfloor where needed, self-level, and apply a crack isolation membrane where there are cracks.
  6. Waterproofing. In wet areas, around the tub and in curbless or walk-in showers, a waterproof membrane under the tile.
  7. Tile. Layout balanced from the doorway, the right mortar, full coverage, leveling system on larger tiles.
  8. Grout and sealant. Grout in the field; flexible sealant at the tub, shower and walls.
  9. Reinstall. Toilet with a new wax ring or seal and correct flange height for the new floor. Vanity reinstalled or a new one installed.
  10. Final clean and walkthrough.

For large-format tile we use large-format mortars such as Mapei Ultraflex LFT, Laticrete 4-XLT or Laticrete 254 Platinum, Schluter DITRA uncoupling membrane over slabs with cracks, and Schluter profiles at edges and transitions.

The plumbing connections are handled by a licensed plumber when required. As the licensed general contractor, we coordinate it so you deal with one company.

Choosing the right bathroom floor tile

Bathroom Floor Tile Options

OptionProsThings to know
Porcelain, matte or texturedWaterproof, durable, slip-resistantOur most common recommendation
Large-format porcelain (24x48)Few grout lines, modernNeeds a flat floor; check slip rating
Wood-look porcelainWarm look, waterproofGreat match with wood in bedrooms
Marble, honedLuxury, uniqueNeeds sealing and pH-neutral cleaning
MosaicBest grip, follows slopesMore grout to maintain
Heated floor system under tileComfortAdds electrical work and planning

For wet bathroom floors we look for a wet slip rating (DCOF) of 0.42 or higher. Polished tile is beautiful but can be slippery.

Toilet, vanity and transitions: the details that matter

  • Toilet flange height. The new floor may be higher than the old one. The flange has to sit at the right height or the toilet will leak. We plan for it.
  • Under the vanity. If the vanity stays, the tile stops at its base. If it's being replaced, tile under the new vanity area allows future layout changes.
  • Door clearance. Thicker floors may need the door trimmed.
  • Threshold. A clean transition to the hallway or bedroom floor, with no trip edge.
  • Tub and shower edges. Flexible sealant, not grout, where the floor meets the tub or shower.

Bathroom floor replacement cost (2026)

Starting prices for labor and setting materials. The final price is based on the size, the tile and what we find under the old floor, and is confirmed after we see the bathroom.

ScopeStarting at
Toilet removal and resetpriced per fixture

After the project review, your written proposal lists the following scope and pricing: Example: a 60 sq ft guest bathroom floor in 12x24 porcelain, with removal, toilet reset and minor leveling, usually for labor and setting materials, plus tile. After the project review, your written proposal lists the following scope and pricing: A 150 sq ft primary bath in honed marble typically plus the stone.

See also cost to tile a bathroom.

How we schedule a bathroom floor

We don't publish standard durations, because every bathroom floor is based on things we can only measure on site. The schedule for your project is in your written proposal, confirmed after the project review. These are the things that decide it:

  • What's under the old floor. Thick mortar beds, a second layer of tile, or rot on a wood subfloor all change the removal and prep.
  • Leaks and repairs. A failed toilet seal, tub edge or drain has to be found and fixed, by a licensed plumber where required, before new tile goes in.
  • What else changes. A floor alone is a smaller job than a floor with a new vanity, a new toilet or a shower rebuild.
  • Waterproofing and cure steps. Membranes, self-leveler, mortar and grout each need their cure time before the next step and before the toilet goes back.
  • Tile on site. We order the tile and the overage from one dye lot and have it on site before we take the old floor out.
  • Condo rules and permits. Association applications, work hours, elevator reservations and inspections where a permit applies. Ask your association for its review calendar, and we build it into the schedule in your proposal.

We'll tell you what we found before going further. If the home has only one bathroom, we plan the work so it's back in service as soon as the materials allow.

Condo bathroom floors

Condos usually require:

  • an approved sound-control underlayment under tile
  • an insurance certificate before work starts
  • work hours and elevator reservations
  • in some buildings, a permit or association application for bathroom work

Upstairs leaks into a neighbor's unit are expensive, so waterproofing and correct toilet sealing matter even more. See condo renovation contractor.

Heated bathroom floors

An electric radiant mat under the tile makes cold mornings comfortable, even in Florida with the AC running. It's installed in a thin layer of self-leveler or thinset before tile. The electrical connection and thermostat are done by a licensed electrician, which we coordinate. See heated bathroom floors.

Common mistakes to avoid

  • Tiling over a leak or a soft subfloor.
  • Leaving the old toilet flange too low under a thicker floor.
  • Using polished tile on a wet floor.
  • Grouting where the floor meets the tub instead of using sealant.
  • Skipping a membrane over slab cracks.
  • Not ordering extra tile from the same dye lot for future repairs.

Small bathroom design tips

A few choices make a small bathroom feel bigger and cleaner:

  • Larger tiles with matching grout reduce visual clutter. A 24x24 or 24x48 can work in surprisingly small bathrooms when the floor is flat.
  • Run the floor tile into the shower (with a curbless or low-curb design) so the room reads as one space.
  • Floating vanities show more floor and make cleaning easier.
  • Light, warm colors reflect light. Very dark floors show water spots and dust.
  • Tile the wall behind the toilet or vanity in the same tile as the floor for a seamless, high-end look.

Bathroom floors in older South Florida homes

Homes built in the 1970s–1990s often have specific issues under the bathroom floor:

  • Cast-iron drains that may be corroded. If we see signs of drain problems, we recommend a licensed plumber inspect them before the new floor goes down.
  • Thick mortar beds under old tile, which change the floor height.
  • Old toilet flanges that are cracked or set too low.
  • Slab cracks that ran through the old tile.

Finding and fixing these during the floor replacement costs much less than tearing up a new floor later.

Matching the bathroom floor to the rest of the house

Many clients use the bathroom floor project to plan the whole house: the same porcelain from the bedroom hallway into the bathroom, or a wood-look porcelain that matches engineered oak in the bedrooms. Planning it together avoids awkward transitions and height differences at the doorway.

What a professional proposal should include

  • removal of the old floor and disposal
  • toilet removal and reset, with a new seal
  • vanity removal and reinstall, or new vanity
  • subfloor or slab repair, crack membrane, leveling
  • waterproofing where required
  • tile, grout type and color, sealant at the tub and walls
  • threshold and door trimming
  • permits where required

Accessible and aging-in-place bathroom floors

Many owners are planning bathrooms they can use for decades. On the floor, that means:

  • slip-resistant tile with a high wet slip rating, or mosaics in the shower
  • curbless showers with the floor sloped to a linear drain, so there's no step to trip on
  • flush thresholds at the bathroom door
  • blocking in the walls for future grab bars while the walls are open
  • enough clear floor space in front of the toilet and vanity

These details are much easier and cheaper to build in during a floor replacement than to add later. See ADA bathroom renovation.

Where we replace bathroom floors

We replace bathroom floors in homes and condos across Broward, Palm Beach and Miami-Dade, including Fort Lauderdale, Boca Raton, Delray Beach, Parkland, Coral Springs, Weston, Pompano Beach, Lighthouse Point, West Palm Beach, Jupiter and Miami. Every job gets the same process: leak check, proper prep, waterproofing where needed, and a written price before we start.

Get a price for your bathroom floor

Send us a few photos of the bathroom and the approximate size, or call (561) 556-7509. We'll check for leaks and floor problems, bring tile samples and give you a written price. J. Perry & Sons is a licensed Florida general contractor (CGC1540699), we pull permits when they're required, and our work carries a workmanship warranty.


Related services: master bathroom remodel

Why South Florida owners choose J. Perry & Sons

  • A licensed Florida general contractor (CGC1540699) with 150+ completed projects and a workmanship warranty.
  • Waterproofed and flood-tested before any tile.
  • Our own tile and waterproofing crews.
  • Permits and condo approvals handled for you.
  • Daily updates with photos, and we call you before every decision.

Want your bathroom to look like this? Plan your master bath

How we work

  1. Project Review. We look at your bathroom with you and talk about how you use it every day.
  2. Proposal. A clear scope and a starting price, everything written down.
  3. Private Showroom Appointment. Choose the tile, the stone, the vanity and the fixtures with us, with samples. You can add our designer for a full design plan; design time is billed separately.
  4. Installation. Demolition, waterproofing and flood test, plumbing by licensed trades, coordinated by J. Perry & Sons, tile, vanity, glass and a final walkthrough, with daily updates.

Away for the season?

Hand us your bathroom project and come back to it finished. You get photos and a short update every day, and we call you before every decision. Keys, deliveries, inspections and cleanup are handled. How renovating while you're away works →

Many of our clients prefer that their homes stay private, so most of our work isn't online. When we meet at your project, we'll show you work similar to yours. See private clients.

Working with an architect or designer? We take over and manage the whole project with them. See architects, engineers and designers.

The Owner's Guide to Bathrooms and Showers

How a shower built to stay watertight is planned, what to ask any contractor and how to care for it.

Next step

Send us a photo of the look you want and a photo of your house. We'll tell you what it's called, how we'd build it and the starting price.

Free Project Review. We look at your project with you and tell you what's possible and a starting price.

Call (561) 556-7509

By submitting, you agree that J. Perry & Sons may contact you by phone, text or email about your project.

Floors that carry the whole house.

Porcelain, wood or stone, chosen for the way you live and installed on a flat, sound base.

Plan My New Floors

Free project review · (561) 556-7509

Flooring architectural design concept

FAQ

How much does it cost to replace a bathroom floor in South Florida? After the project review, your written proposal lists the following scope and pricing: A small guest bath floor in porcelain usually for labor and setting materials, including removal and toilet reset. Larger or stone floors cost more, and tile is priced separately.

Do you have to remove the toilet to replace bathroom tile? Yes. The toilet comes out so the tile can run underneath, and it's reset with a new seal at the correct flange height for the new floor.

Can you replace the floor without removing the vanity? Yes, the tile can stop at the vanity base. If you plan to replace the vanity soon, it's better to do both together.

What is the best tile for a bathroom floor? A matte or textured porcelain with a good wet slip rating. Honed marble and mosaics are good options for a more luxurious or grippy floor.

How long does a bathroom floor replacement take? Every project is different. Your schedule is written into the proposal once we've seen the space and confirmed the scope. Leak repairs and condo approvals are the biggest factors.

Free Project Review

Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.

Extraordinary spaces. A thoughtful first step.

Share your vision for your South Florida home.

Book My Free Project Review

Free project review · (561) 556-7509

Extraordinary Spaces architectural design concept