By John Perry
"I've been told the wall between my kitchen and living room is load-bearing. One person said it's a small job, another said it's a big one. Before I hire an engineer or get quotes, I want to know what actually drives the price, and what I'll be paying for separately."
Short answer: at J. Perry & Sons, removing a load-bearing wall with a new beam is starting at $12,500, and an opening cut or enlarged in a load-bearing block wall is priced in your written proposal after the project review. Engineering and permit fees are separate. Where your project lands above that starting price is based on seven things: the span, the beam or lintel type, the shoring, what is inside the wall, the posts and footings, the engineering and permit, and the finishes after the structure is done. This guide takes each one in turn so you can read any quote line by line.
J. Perry & Sons is a licensed and insured general contractor (CGC1540699) working across Broward, Palm Beach and Miami-Dade, with 150+ projects completed. We are not the engineer. The engineer designs the structure; we build it to the sealed drawings and pull the permit.
Next step: before you read further, decide which job you have: a wall that comes out completely, or a wall that stays with a bigger opening in it. The two are priced differently.
Removal or opening: two different jobs

The first question that sets the price is not how big the wall is. It is what you want to happen to it.
Full removal for an open plan. The wall comes out, and a beam replaces it. The beam gathers the load and drops it at posts, and the posts need footings that can carry it. The ceiling is opened along the beam, and the floor where the wall stood has to be filled and finished. Details are on our load-bearing wall removal page.
An opening in a wall that stays. A doorway is widened, or a new door, window or pass-through is cut, and the rest of the wall keeps carrying load. In a block home, the bond beam at the top of the wall usually stays, and new reinforced, grouted jambs are built on each side. Details are on our block wall openings page.
An opening is often enough. Many homeowners who ask for a full removal find that a wide opening of seven or eight feet gives them the connected feel they wanted, with less ceiling work, no floor gap down the middle of the room, and a lower price. Ask for both options at the review.
| Full removal | Opening in the wall | |
|---|---|---|
| What you get | One open room | Two rooms joined by a wide opening |
| Structure | New beam, posts, footings | Jambs and lintel or existing bond beam |
| Ceiling work | Along the beam, more for a flush beam | Around the opening |
| Floor work | Strip where the wall stood | At the opening only |
Both starting prices exclude engineering and permit fees.
Next step: ask the engineer to look at both options on the same visit.
Factor 1: the span
The wider the opening or the longer the wall that comes out, the more load the new beam or lintel has to carry over a longer distance. A longer span usually means a deeper or heavier beam, stronger connections and more shoring. It is the single factor most homeowners can control: pulling the opening in a little can sometimes allow a smaller beam or keep an existing bond beam working without added reinforcement. The engineer tells you where those break points are for your house.
Next step: give the engineer a range of widths you would accept, not one fixed number.
Factor 2: the beam or lintel
Material. Steel wide-flange beams carry the most in the shallowest depth and are fabricated to order, so they cost more to make and to bring into the house. Engineered wood beams (LVL or glulam) are lighter and fasten directly to wood framing where the design allows them. In block walls, a poured or precast concrete lintel, or reinforcement of the existing bond beam, is the usual design.
Flush or dropped. A dropped beam sits under the ceiling with the framing resting on it. A flush beam is hidden in the ceiling plane with the joists hung from it. The flush beam is the cleaner look and the bigger job: more ceiling opened, each joist cut and hung, more drywall to replace and finish. In homes with roof trusses, the engineer decides whether a flush beam is possible at all.
Who makes it. On our projects, steel beams are fabricated to the engineer's details and installed by our crew.
Next step: ask for a price on both flush and dropped if the engineer allows both. The difference is often worth seeing in writing.
Factor 3: shoring
While the wall is out, something has to hold up what it was carrying. Temporary shoring walls or adjustable shores go up on one or both sides. A one-story house with a short wall needs less shoring than a two-story house where the wall carries a floor and the shoring has to be set on both levels. Shoring is also where a low quote can quietly cut corners. If a quote does not mention it, ask.
Next step: ask every bidder to describe their shoring in one sentence. If they can't, that's an answer.
Factor 4: what is inside the wall
This is the cost most homeowners don't see coming. Kitchen and family room walls carry switches, outlets, kitchen circuits, water lines, drains, plumbing vents, return air grilles, ducts and low-voltage wiring. Every one of them has to go somewhere else before the wall comes out.
- Electrical: outlets and switches moved, circuits rerouted, sometimes a panel issue.
- Plumbing: supply and drain lines, and the hardest one, a vent stack running to the roof.
- HVAC: returns, supplies and refrigerant lines rerouted through the ceiling or another wall.
On our projects, this relocation is done by licensed electricians, licensed plumbers and licensed HVAC technicians, coordinated and permitted by J. Perry & Sons, with the project staying under J. Perry & Sons. A plumbing vent or a main duct run in the wall can add more to the job than the beam itself, which is why we look inside before the price is final.
Next step: photograph every switch, outlet, grille and thermostat on the wall, on both sides.
Factor 5: posts and footings
A beam ends at posts, and each post delivers a concentrated load. The engineer decides whether the existing slab can carry it or whether a new footing is needed. A new footing means cutting the slab, excavating, setting rebar and pouring concrete, then patching the floor. In a two-story home, a post on the upper floor needs support below it all the way down. On our projects, new footings and slab work are coordinated by J. Perry & Sons, with the project staying under J. Perry & Sons. For slab cutting, see concrete cutting and core drilling.
Openings in block walls usually do not need new footings, because the new grouted jambs bear on the existing wall's foundation. The engineer confirms it.
Next step: ask the engineer whether the design needs new footings. It is one of the biggest swings in the price.
Factor 6: engineering and permit
Engineering is separate. A structural engineer has to design the beam or opening and seal the drawings. You can hire the engineer directly, or we arrange one. Engineering is billed by the engineer, not included in our starting prices.
The permit is separate. Structural work in Florida needs a permit with engineered drawings. J. Perry & Sons pulls the permit and follows every city and county requirement, and permit fees are set by the building department, so they are listed separately from our work. See permits and compliance.
Exterior walls cost more to design. An opening in an exterior wall has to meet wind requirements as well as structural ones. Miami-Dade and Broward are in the High-Velocity Hurricane Zone, and Palm Beach County is not, so the design and the product approvals differ by county. An exterior opening also needs an impact door or window; see impact windows and doors.
Next step: ask whether a quote includes engineering, the permit, both or neither. Many quotes look low because they leave both out.
Factor 7: finishes after the structure
The structure makes the project possible. The finishes decide what it costs to make it look right.
Ceiling. A dropped beam needs the beam wrapped and the ceiling patched along it. A flush beam needs a larger area of ceiling replaced. On a long, flat ceiling, a Level 5 drywall finish is what keeps patch lines from showing.
Walls. Wall ends, returns and post wraps are framed and finished by our drywall crew.
Floor. Where a wall comes out, there is a strip of bare slab and two floors that rarely match. Patching rarely looks right; one new floor through the open area usually does. See flooring installation and the tile installation cost guide.
Kitchen. If the wall is coming out to open a kitchen, the island, cabinets and lighting are usually part of the same project. See kitchen renovation.
Paint. Open rooms are painted as one space so the colors match.
Next step: decide whether you're opening the wall now and finishing later, or doing it all at once. Doing it at once avoids paying for temporary patches.
What a complete quote should list

When you compare quotes, line them up against this list. Any line missing from a quote is either excluded or hidden in another line, and you should know which.
- Engineering (included, or by owner)
- Permit (pulled by whom, fees included or separate)
- Floor and house protection, dust control
- Temporary shoring
- Wall removal or saw cutting
- Electrical, plumbing and HVAC relocation
- Beam or lintel, posts, connections
- Footings and slab work, if required
- Grouted jambs (for block openings)
- Inspections
- Debris removal
- Ceiling and drywall repair
- Floor tie-in or new floor
- Paint
Next step: send us any quote you already have and we'll tell you which lines it leaves out.
How to plan the project and keep the cost in line
Start with photos and a review. Photos of both sides of the wall and the ceiling above it, plus any house plans you have, let us tell you in the Free Project Review whether you are likely looking at a removal or an opening and what usually comes with it.
Bring in the engineer early. The engineer's design sets the beam, posts and footings, which set most of the structural price. Ask for the options: narrower span, dropped instead of flush, an opening instead of a removal.
Find out what's in the wall before the final price. Small inspection openings now cost far less than surprises later.
Plan the finishes with the structure. Floor, ceiling and kitchen choices made before the wall comes out avoid temporary patches that get torn out later.
Choose one contractor for the whole scope. When one company handles the structure, the relocations with the licensed specialty work coordinated by J. Perry & Sons, the permit and the finishes, nobody argues over who left the floor gap. See general contractor in South Florida.
Next step: gather your photos and plans and book the review.
Related costs homeowners ask about
Non-structural walls. A wall that carries no load still needs the same care with what is inside it, but no beam, shoring or engineer. See interior demolition cost in South Florida.
New block walls. After the project review, your written proposal lists the following scope and pricing: A new CMU block wall built by our crew, with rebar, grout and bond beam per the drawings, wall area measured. Engineering and permit fees are separate. See masonry and CMU block wall contractor.
Home additions. Additions are priced only after the project review, because each one is different. See home addition contractor.
Damaged block or concrete. Cracked block walls and spalling beams are repair work, priced on their own. See CMU block wall reinforcement.
Related services
Load-bearing wall cost FAQ
How much does it cost to remove a load-bearing wall in Florida?
After the project review, your written proposal lists the following scope and pricing: At J. Perry & Sons, load-bearing wall removal with a new beam. Engineering and permit fees are separate. The final price is based on the span, beam type, shoring, what's in the wall, posts and footings, and finishes.
How much does it cost to widen a doorway in a block wall?
After the project review, your written proposal lists the following scope and pricing: An opening in a load-bearing block wall, with engineering and permit fees separate. Width, lintel needs, relocations and finishes set the final number.
Is engineering included in your price?
No. Engineering is separate. You can hire the engineer, or we arrange one. We build to the engineer's sealed drawings; we are not the engineer.
Why do quotes for the same wall vary so much?
Usually because they include different things. One may include shoring, relocation, the permit and finishes; another may leave them out. Use the 14-line checklist above to compare.
Is a flush beam worth the extra cost?
If you want a perfectly flat ceiling across the open room, yes. If a header across the ceiling works with your layout, a dropped beam saves ceiling work. Ask for both prices.
Is it cheaper to make an opening than to remove the whole wall?
Usually. An opening keeps most of the wall working, often needs no new footings, and leaves less ceiling and floor to finish.
Can I do the finishes later to save money now?
You can, but temporary patches cost money and are torn out later. Planning the floor and ceiling with the structure is usually the better value.