"Our kids are past bath age, the tub just collects shampoo bottles, and the fiberglass is starting to crack." That is how a lot of Miramar conversations start. Many homes here came with the same package: an acrylic or fiberglass tub-shower combo in the hall bath, a soaking tub in the primary that is used twice a year, and small tile with wide grout joints that never look clean.
We replace that package with a bathroom built for how your family actually lives. Often that means converting the tub to a walk-in shower with a bench and niche, upgrading to larger porcelain with tighter grout lines, adding a vanity with real storage and putting in lighting and ventilation that work. The new shower is built from the ground up and waterproofed properly, not slid in over the old one. When the primary suite is in the plan too, a master bathroom remodel lets us size the shower and vanity for two adults at once.
Western Miramar communities such as Silver Lakes, Monarch Lakes, Sunset Lakes, Riviera Isles and Huntington are largely newer master-planned neighborhoods, so the bathrooms are usually structurally sound but finished with builder-grade materials that are now wearing out. East of there, around Miramar Isles and the older sections of the city, homes tend to be older, and we expect more surprises once the walls are open, from previous patch work to plumbing that has been modified more than once.
Either way, the first step is the same. We see the room in person, open up an access panel or check moisture where possible, and ask which problems you want solved, not just which tile you like. Good bathroom remodel contractors look before they quote, and that look is part of every review we do in Miramar.
Removing every tub in the house is not always the right call. If you have young children, or you are thinking about resale to a growing family, keeping one tub somewhere in the home makes sense. A common Miramar plan is a tub to shower conversion in the primary bath, turning it into a large walk-in shower while keeping a renovated tub-shower in the hall bath for the kids.
We will walk you through the trade-offs during the Free Project Review, and once the proposal is signed our designer can prepare a rendering of each option before materials are ordered. We also bring tile and fixture samples to your home so you choose under your own lighting. Sometimes the right answer is a simple shower remodel in one bath while the tub stays in the other.


How a shower built to stay watertight is planned, what to ask any contractor and how to care for it.
+ Free one-page checklist: Before You Remodel Your Bathroom
Across Miramar, shower replacements start at $13,500 and a full hall bath starts at $46,500. A primary bath with a double vanity, frameless glass and full-height tile is priced above those starting figures.
Each final number is based on the bathroom's size, the tile and fixtures you choose, whether drains or supply lines move, glass, electrical changes, HOA requirements and whatever we uncover after demolition. You see the full scope in writing before anything starts.
Most of Miramar's planned communities have a homeowners association, and many want an application before a contractor can work, even on interior projects, so that gate access, parking and dumpster placement are approved. We fill out the paperwork and coordinate with management for you.
On the city side, bathroom work that changes plumbing, electrical or walls needs a permit from the City of Miramar. J. Perry & Sons is the licensed general contractor of record, CGC1540699, so we submit the application, schedule each inspection and handle the inspector. Miramar is in Broward County and the High Velocity Hurricane Zone, so a replacement bathroom window or new exterior vent must use HVHZ-approved products.
Once the old tub and tile are out, we rebuild the shower in layers. A mortar pre-slope is floated by hand toward the drain. Durock cement board goes on the walls. Laticrete or RedGard waterproofing covers the entire wet area, selected based on the shower's size and features. Then we flood test the base and confirm it holds water before any tile is installed.
Tile is set using Mapei thinset and grout, or Laticrete products when the material calls for them, and large-format floor tile is checked with a straightedge so it stays within 1/8 inch over a 10-foot run.
We also look closely at the transition between the bathroom and the hallway. Many Miramar homes have tile or laminate running right up to the bathroom door, and a new floor that sits higher can create a lip. We plan the height of the new assembly and the threshold so the change is smooth and nobody trips at night.

Our Miramar clients are often working parents with full schedules. Once selections are made, we run the job, keep the work area sealed off from the rest of the house and send a daily update with photos. If you are traveling, you come back to it finished. To get started, call (561) 556-7509 or send photos of your bathroom through the form for a Free Project Review.
Your project manager answers questions directly, so you are never chasing a crew member for information. If something unexpected comes up behind the walls, you hear about it the same evening, with photos and a recommendation, and nothing beyond the signed scope moves forward without your approval. That keeps the bathroom renovation moving without taking over your week.
Call (561) 556-7509 or send us your project with photos, the city, approximate dimensions, and material selections.
Let's create a bathroom that brings calm to every day.
Free project review · (561) 556-7509

Share your vision for your South Florida home.
Free project review · (561) 556-7509