Fort Lauderdale's luxury condo market runs from the beach to the Intracoastal and downtown. J. Perry & Sons works with building management on every project and plans around association rules, approval packages, sound requirements and the craftsmanship standards these properties expect.
Fort Lauderdale Condo Buildings We Serve
We renovate condos throughout Fort Lauderdale and the rest of Broward County: oceanfront and Intracoastal high-rises, downtown towers, mid-rise buildings and boutique residences. Every building has its own rules for flooring, sound underlayment, work hours, elevator use and debris removal, so we start each project by reading your association's written requirements and building the approval package around them. Broward is in the High-Velocity Hurricane Zone, which matters for balcony work, sliding doors and windows. We pull the permits for the work that needs them, and plumbing and electrical are done by licensed trades, coordinated by J. Perry & Sons.
The Owner's Guide to Renovating a Condo
What your association will ask for, the rules that change your floors and how to plan around them.
+ Free one-page checklist: Your Condo Renovation Approval Checklist
Sound Underlayment: Building to Your Association's Rule
In a Fort Lauderdale high-rise, the floor you install is also the ceiling of the owner below. That is why almost every association has a written flooring rule, and why the sound underlayment is the part of a condo floor that gets inspected, questioned and, when it is done wrong, torn out.
The rule usually names a minimum sound rating. STC (Sound Transmission Class) covers airborne sound such as voices and television. IIC (Impact Insulation Class) covers footsteps, dropped objects and chairs dragged across tile. Some buildings ask for a tested floor-ceiling assembly, not just a number printed on a roll of membrane. That difference matters: the rating belongs to the whole assembly (slab, underlayment, setting material, tile and the ceiling below), so the test report has to match what is actually being installed.
How we install it so it performs:
- Read the rule first. We get the association's current written flooring requirement before any material is ordered, and we match the product and its test report to it.
- Keep the floor isolated from the walls. Sound travels through any hard contact. We leave a perimeter gap at walls, columns and cabinets, fill it with flexible sealant instead of grout, and keep baseboards from pinning the tile to the wall.
- No shortcuts at transitions. Thresholds, door jambs and kitchen toe kicks are where sound bridges usually happen. Each one is detailed so the tile never touches the structure directly.
- Leave it open for inspection. Many buildings send someone to see the underlayment before tile covers it. We schedule that visit with management so nothing gets installed over an uninspected layer.
We supply the underlayment from the preferred brands we work with, matched to the building's rule, along with the tile and setting materials. See our condo flooring rules guide for how STC and IIC are measured.
Next step: send us your building's flooring rule (or a photo of it) and we will tell you which underlayment assembly meets it.
Leveling a Condo Slab for Large-Format Tile

Large-format porcelain (24x48, 32x32, 48x48) and marble look seamless only when the slab under them is flat. Concrete slabs in older and newer towers alike have humps, dips and old adhesive ridges. Large tiles do not bend to follow them, so an unlevel slab shows up as lippage (one tile edge higher than the next), hollow spots and cracked tiles later.
The industry standard for tile with any side 15 inches or longer is tight: the substrate should not vary more than 1/8 inch in 10 feet. Our process to get there:
- Remove the old floor down to clean concrete. Old tile, thinset and adhesive come up completely. We use dustless removal methods in occupied buildings.
- Map the slab. We check flatness across every room with a long straightedge and laser, and mark the high and low spots.
- Grind the highs. Ridges and humps are ground down rather than built over.
- Fill the lows with mortar mix. For tile, we level with a sand-and-cement mortar mix bonded to the slab, not a self-leveler. Self-leveling compound is the right product under vinyl; under heavy porcelain and stone, mortar mix gives a stronger, more stable base. Read more in our mortar mix and thinset guide.
- Follow the tested assembly. Whether the underlayment goes on the leveled slab or the leveling goes over it is set by the underlayment's tested assembly and the building's rule.
- Set the tile with full coverage. Large tile is back-buttered and set with a leveling system so every edge sits flush.
Finished floor height matters in a condo: leveling, underlayment and tile together raise the floor, which affects entry doors, sliding door thresholds, appliance openings and the meeting point with the hallway. We plan those heights before we price. See our floor leveling and large-format tile installation pages.
Next step: tell us the tile size you have in mind and we will tell you what the slab will need before it goes down.
The Association Approval Package, Item by Item
Most delays in a condo renovation start before the first tile comes up: an incomplete application sent back by management. In Fort Lauderdale buildings, the package usually includes the items below. Your building's form is the final word, so we start from it.
- Alteration application signed by the owner, describing the scope room by room.
- Floor plan marked with the areas being changed and the finish in each.
- Product data sheets for the tile, setting materials and the sound underlayment, plus the sound test report for the assembly.
- Contractor license and insurance. J. Perry & Sons is licensed and insured. Certificate of insurance available on request, issued with the wording and additional insured names the association asks for.
- Permit information. In Broward, tile replacement, bathroom plumbing changes, electrical work and any wall changes can each trigger a permit. We pull all permits ourselves and follow every city and county requirement. See our Broward County permits guide.
- Work rules acknowledgment: allowed work hours, elevator reservation and padding, delivery route, debris removal and protection of hallways.
- Plumbing and electrical scope, done through our licensed partners, with the project staying under J. Perry & Sons.
We assemble the contractor side of the package and coordinate with the property manager, so you are signing documents instead of chasing them. Our HOA and condo approval guide covers what boards look for.
Next step: forward us the blank alteration form from your management office and we will tell you exactly what we will provide.
Renovation Services for Fort Lauderdale Condos
- Full condo renovation and gut remodel
- Tile installation — porcelain, marble, and large-format
- Bathroom renovation — shower tile, vanity, and waterproofing
- Kitchen renovation — countertops, backsplash, and cabinets
- Flooring — engineered hardwood, porcelain and natural stone over the building's approved sound underlayment
- Stone veneer and feature walls
- Painting and interior finishes
- Custom closets
Balconies, Bathrooms and What Drives the Price

Three parts of a Fort Lauderdale condo renovation carry the most rules and the most cost.
Balcony tile. Balconies in Broward are exposed to salt air and wind-driven rain and sit in the High-Velocity Hurricane Zone. Many associations control the tile, the color and the waterproofing under it, and some require the concrete to be inspected before new tile goes down. Balcony waterproofing membranes are installed by licensed specialty contractors, coordinated by J. Perry & Sons, where the building calls for them. See our guide to condo balcony tile replacement rules.
Bathrooms. A condo shower sits over someone else's ceiling. We build the waterproofing as a continuous system from the drain to the walls, flood test it before tile, and keep plumbing and drain locations within what the building and the plans allow. Moving a drain in a condo slab is reviewed with the association and, where the slab requires it, an engineer.
What drives the price. Pricing is given in the itemized written proposal, and it is based on:
- Square footage of tile and the tile size (large-format needs more slab preparation)
- How much leveling the slab needs
- The underlayment assembly your building requires
- Removal of the existing floor and debris handling rules
- Work-hour limits and elevator access
- Bathroom scope, glass and plumbing changes
- Permits and inspections
We bring material samples to your unit, and once you sign the proposal a simple rendering is included so you can see the finish before materials are ordered. For tile work across the city, see tile installation in Fort Lauderdale.
Next step: send photos of each room, the city and your material ideas, and we will set up your Free Project Review.
FAQ
Do I need association approval to replace tile in my Fort Lauderdale condo?
In most buildings, yes. Hard-surface flooring is one of the items associations control most closely because of noise to the unit below. Expect to submit an alteration application with the products, the sound underlayment and its test report, and the contractor's license and insurance. We prepare the contractor side of that package with you.
What sound rating does my condo floor need?
That is set by your association's written rule, not by a general number. Some buildings name a minimum STC and IIC rating; others require a specific tested floor-ceiling assembly. We read your building's rule and match the underlayment and its test report to it before any material is ordered.
Why do you level with mortar mix instead of self-leveler?
Self-leveling compound is the right product under vinyl. Under large-format porcelain and natural stone, we level with a sand-and-cement mortar mix bonded to the slab, which gives a stronger, more stable base for heavy tile. High spots are ground down first, then the lows are filled.
Will the new floor be higher than my old one?
Usually a little. Leveling, the sound underlayment and the tile together add height, which can affect entry doors, sliding door thresholds and appliance openings. We plan the finished floor height before pricing so doors, transitions and the hallway meeting point are handled in the proposal.
Do you pull the permits for condo work in Fort Lauderdale?
Yes. J. Perry & Sons pulls all permits itself and follows every city and county requirement. Plumbing and electrical work is done by licensed plumbers and electricians, coordinated by J. Perry & Sons.
We prepare the contractor documents and follow your building's rules.
Free project review · (561) 556-7509





