Miami's luxury condo market, from downtown glass towers to bayfront residences and boutique buildings, demands a renovation contractor who understands high-rise condo work. J. Perry & Sons works with building management on every project and plans around approval packages, elevator scheduling, sound rules and noise restrictions, so you don't have to.
Miami Condo Buildings We Serve
We renovate condos throughout Miami and Miami-Dade County: downtown and bayfront high-rise towers, waterfront residences, mid-rise buildings and boutique condos. Each building has its own rules for flooring, sound underlayment, work hours, elevator and loading dock use and debris removal, so every project starts with your association's written requirements. Miami-Dade is in the High-Velocity Hurricane Zone, which matters for balcony work, sliding doors and windows. We pull the permits for the work that needs them, and plumbing and electrical are done by licensed trades, coordinated by J. Perry & Sons.
The Owner's Guide to Renovating a Condo
What your association will ask for, the rules that change your floors and how to plan around them.
+ Free one-page checklist: Your Condo Renovation Approval Checklist
How Approval Works in a Miami High-Rise

Miami towers run renovations through building management, and most of them will not let a contractor through the service entrance until the paperwork is approved. Knowing the order of steps keeps your project from stalling at the front desk.
- Get the building's current rules in writing. Ask management for the alteration application, the flooring and sound rule, the contractor requirements, the work-hour policy and the elevator and loading dock procedure. Rules change, and an old copy from a neighbor is not enough.
- Define the scope room by room. The application asks what changes: floors, bathrooms, kitchen, walls, ceilings, doors. Wall changes and plumbing or electrical work usually need drawings and a permit.
- Submit the products. Tile, stone, setting materials and the sound underlayment with its test report. In many towers the underlayment report is reviewed before anything else.
- Submit the contractor documents. J. Perry & Sons is licensed and insured. Certificate of insurance available on request, with the additional insured names and limits your building asks for.
- Pull the permits. Miami-Dade and the City of Miami review interior work that touches plumbing, electrical, walls or windows. We pull all permits ourselves and follow every city and county requirement. See our Miami-Dade permits guide.
- Book the elevator and dock. Deliveries and debris go on reserved service elevator time, with padding and floor protection from the dock to your door.
Plumbing and electrical scopes are done by licensed trades, coordinated by J. Perry & Sons. Our condo renovation rules checklist lists every item in one place.
Next step: ask management for the alteration packet and send it to us; we will mark what we provide and what needs your signature.
Floors in a Tower Unit: Sound, Flatness and Height

Floors are where Miami condo projects most often go wrong, because three requirements meet in a few inches of height: the building's sound rule, the flatness large tile needs, and the doors and thresholds that have to still open.
Sound underlayment to the building's rule. Towers set a minimum STC and IIC rating, or a specific tested floor-ceiling assembly. The rating belongs to the full assembly, so we match the exact underlayment, setting material and tile to the test report your building accepts. The floor is isolated from walls and columns with a perimeter gap filled with flexible sealant, never grout, so sound cannot travel into the structure. If the building inspects the underlayment before tile, we schedule that visit with management.
Flatness for large-format tile. Post-tensioned concrete slabs, common in Miami towers, are rarely flat enough for 24x48 or 48x48 porcelain as poured. Tile with any side 15 inches or longer needs a substrate within 1/8 inch in 10 feet. We grind the high spots and fill the lows with a sand-and-cement mortar mix bonded to the slab. Self-leveler is for vinyl; for heavy porcelain and stone, mortar mix gives the stronger base. Our Miami floor leveling page covers the process.
Never cut a post-tensioned slab blind. Post-tension slabs carry steel tendons under high tension. Any coring or cutting, for a drain or a floor outlet, is reviewed with the association and the engineer and the slab is scanned first. It is done only as part of the project, never as a guess.
Height and thresholds. Leveling, underlayment and tile raise the floor. We plan the finished height at the entry door, the impact sliding doors to the balcony and the kitchen appliances before we price.
We supply all floor materials from the preferred brands we work with. Engineered wood is also an option over an approved underlayment; see engineered wood flooring and flooring installation in Miami.
Next step: send your building's flooring rule and your tile size, and we will tell you what the slab and underlayment will need.
Condo Renovation Services in Miami
- Full condo gut renovation and remodel
- Tile installation — porcelain, marble, large-format, and mosaic
- Flooring installation — engineered wood, porcelain and natural stone over the building's approved sound underlayment
- Bathroom renovation — shower tile, vanity, fixtures, and waterproofing
- Kitchen renovation — countertops, backsplash, cabinets, and flooring
- Stone veneer and feature wall installation
- Fireplace installation (electric fireplaces for condos without gas)
- Custom closet installation
- Painting — interior walls, ceilings, and trim
Bathrooms Above Another Owner's Ceiling
In a tower, a shower leak is not only your problem. It shows up in the unit below, and the association will want to know who built the shower. That is why a condo bathroom is built as a waterproof system first and a tile project second.
- Demolition to a clean slab and studs. Old mortar beds and failed membranes come out completely. In occupied buildings we use dust control and bag debris for the service elevator.
- Continuous waterproofing. The membrane runs from the drain across the floor and up the walls, with every seam, niche, bench and valve penetration sealed. Steam showers get a vapor barrier and a sloped ceiling.
- Slope to the drain. The shower floor is pitched with mortar mix so water never sits under the tile.
- Flood test before tile. The pan is filled and checked before any tile is set. Many buildings ask for proof.
- Plumbing within the rules. Moving a drain or a valve in a tower slab is reviewed with the association, and the plumbing is done by licensed trades, coordinated by J. Perry & Sons.
- Curbless entries. A zero-threshold shower usually needs a recessed slab. In a post-tensioned tower, that is often not allowed, so we build the look with a raised floor and a linear drain where the height permits.
See our shower tile installation page for finishes, from full marble walls to large-format porcelain slabs.
Next step: send photos of your bathroom and the shower you want, and we will tell you what the building will need to approve it.
Sliding Doors, Windows and What Drives the Price
Impact sliding doors and windows. Miami-Dade is in the High-Velocity Hurricane Zone, so replacement doors and windows need Miami-Dade product approval, a permit and the design pressures set for your floor by the engineer or code. Associations also control frame color, glass tint and the look from the outside. We install PGT, CGI, ES Windows and WinDoor and coordinate the building's requirements. See impact sliding glass doors.
What drives the price. Pricing is given in the itemized written proposal, and it is based on:
- The rooms and square footage in scope
- Tile size and how much slab leveling it needs
- The sound underlayment assembly your building requires
- Bathroom scope, waterproofing and any plumbing changes
- Elevator time, loading dock access and work-hour limits
- Protection of hallways and debris rules
- Doors, windows and permits
We bring material samples to your unit, and once you sign the proposal a simple rendering is included so you can see the finish first. A more detailed design is done by the designer on our team as a separate scope.
Next step: send photos of each room and your building's renovation rules, and we will set up your Free Project Review.
FAQ
How long does building approval take for a Miami condo renovation?
That is set by your building's management and board, not by us. What we can control is a complete package: products, sound underlayment report, license, insurance and permit information submitted together. A complete package avoids the most common reason an application is sent back.
Can I install large-format porcelain in a Miami high-rise?
In most buildings, yes, as long as the assembly meets the building's sound rule. Large tile needs a very flat slab, so we grind the highs and level the lows with mortar mix before the underlayment and tile go down, following the tested assembly the building accepts.
Can you move my shower drain in a high-rise?
Sometimes. Many Miami towers have post-tensioned slabs, and any coring needs association review, an engineer and a slab scan first. When moving the drain is not allowed, we design the shower around the existing drain or use a linear drain on a raised floor where the height allows.
Do I need impact sliding doors if I renovate my condo?
Not because you renovate the interior. If you replace sliding doors or windows, the new units must meet Miami-Dade product approval and the design pressures for your floor, and the association usually controls the frame color and glass look.
Who handles the plumbing and electrical in my condo?
Plumbing and electrical work is done by licensed plumbers and electricians, coordinated by J. Perry & Sons. We pull the permits and coordinate the inspections, so you have one contractor responsible.
We prepare the contractor documents and follow your building's rules.