charcoal quartz waterfall island
Kitchen Renovation

Kitchen Renovation in Delray Beach, FL: What to Know Before You Start

Everything Delray Beach homeowners need to know before starting a kitchen renovation — permits, costs, the order of work, and why choosing the right contractor makes all the difference.

Request a Free Project Review
FL CERTIFIED GC ·CGC1540699
150+Projects Completed
Free Project ReviewBook yours today
WorkmanshipWarranty

Delray Beach has one of the most active luxury renovation markets in Palm Beach County. From the historic homes near the beach to newer construction in the city's western communities, homeowners here are investing heavily in kitchen renovations that reflect the city's sophisticated, laid-back luxury lifestyle.

Do You Need a Permit for a Kitchen Renovation in Delray Beach?

Yes — any kitchen renovation in Delray Beach that involves electrical, plumbing, or structural work requires permits from the City of Delray Beach Building Department. This includes moving outlets, adding circuits for new appliances, relocating plumbing for a new sink or island, and removing walls. Permit needs should be confirmed with the City of Delray Beach Building Department before work begins.

The Owner's Guide to Kitchens and Countertops

How to plan a kitchen around the way you live, choose surfaces and compare proposals.

+ Free one-page checklist: Before You Remodel Your Kitchen

Kitchen Remodel in Delray Beach: Coastal Homes, Historic Districts and HOA Communities

Where your house sits in Delray Beach changes the paperwork before it changes the kitchen. We see three common situations.

Older homes near the coast. East of I-95, many homes are older, some close enough to the ocean that salt air reaches the kitchen through every open door. Cabinet hardware, faucets and appliance trims need coastal-rated finishes, and sink bases need plywood boxes that hold up to humidity. Older homes also bring older plumbing and wiring, which we check before the layout is final.

Homes in a historic district. Delray Beach has designated historic districts. Interior work like cabinets, counters and tile is normally not reviewed. But if your kitchen plan changes a window, adds a door to the yard or alters anything visible from the street, the city's historic preservation review comes first, then the building permit. We check this before we design a new opening.

Homes in a gated or HOA community. West of I-95, many owners live in communities with a homeowners association. The association often reviews the scope, sets work hours, limits where dumpsters and trucks can sit and requires the contractor's license and insurance on file at the gate. Our guide to HOA approval for a renovation explains what boards usually ask for.

Wind rules. Palm Beach County is outside the High-Velocity Hurricane Zone, but any kitchen window or slider you replace still has to be impact-rated or protected and carry a Florida Product Approval.

In all three cases, J. Perry & Sons pulls the permits and prepares the approval packages. Our permits and compliance page explains how we handle inspections.

Next step: tell us whether your home is in a historic district or an HOA community, and we will list the approvals your kitchen needs.

What Are Delray Beach Homeowners Renovating in 2026?

The most common kitchen renovation requests we receive in Delray Beach: full gut renovations with custom cabinetry and natural stone countertops, kitchen expansions that open the space to the living area, island additions with waterfall quartzite or quartz countertops, and appliance upgrades to smart, integrated systems.

Custom Kitchen Remodel: How We Build Yours

Infographic showing six steps of a custom kitchen remodel in Delray Beach, from field measure to slab templating.

A custom kitchen remodel is not a catalog kitchen with upgraded handles. Every cabinet is drawn for your room, your appliances and the way you cook. Kitchen renovations in Delray Beach start at $28,000, and a fully custom kitchen is priced in the written proposal after the project review. Here is how we take it from an idea to an installed kitchen.

1. Project review and field measure. We walk the kitchen with you, measure every wall, window and ceiling height, and note what is behind the walls.

2. Layout and rendering. We lay out the kitchen around how you use it: where you prep, where guests stand, where the coffee station goes. Once you sign the proposal, a simple rendering of the layout and finishes is included. If you want a fully detailed design, our in-house designer prepares it and it is billed separately. See our renderings and samples page.

3. Samples at your table. We bring cabinet doors, stone, tile and hardware samples to your home, so you see them in your own light.

4. Appliance specs first. Panel-ready refrigerators, column freezers and built-in coffee systems have exact cutout sizes. We lock the appliance models before the cabinet drawings are final.

5. Shop drawings. Our crew produces drawings for every box, panel and filler. You approve them before anything is built.

6. Slab selection and templating. You choose the actual slabs. After the cabinets are set, the counters are templated to the installed boxes, not to the plans. Our residential countertops and slabs page covers the stone options.

7. Install and finish. Our crews set the cabinets, install the slabs and finish the tile, with plumbing and electrical done by licensed electricians and licensed plumbers, coordinated by J. Perry & Sons.

Next step: send us a photo of a kitchen you love, and we will show you how we would build it in your house. See our kitchen renovation service page for the full scope.

Kitchen Renovation Timeline in Delray Beach

  • Consultation & design. Timing is confirmed in your written proposal.
  • Permit approval (City of Delray Beach). Timing is confirmed in your written proposal.
  • Demo and rough work (plumbing, electrical). Timing is confirmed in your written proposal.
  • Cabinet installation. Timing is confirmed in your written proposal.
  • Countertop fabrication and installation. Timing is confirmed in your written proposal.
  • Tile, backsplash, fixtures, final details. Timing is confirmed in your written proposal.
  • Total. Timing is confirmed in your written proposal.

Islands and Floors: Tying the New Kitchen Into the House

Two parts of a Delray Beach kitchen decide how well it connects to the rest of the home: the island and the floor.

Adding or enlarging an island. In a single-family home on a slab, an island sink or a prep sink means cutting a trench through the concrete for the drain, setting the line at the right slope and patching the slab before the floor goes down. Power for outlets, a microwave drawer or pendants is run the same way. Our guide to kitchen island addition cost explains what goes into it. We plan clearances so two people can work and a third can walk past without a squeeze.

The floor problem. Most Delray kitchens open to the family room. If the old tile runs through both, a new kitchen floor usually means new tile across the whole open area, because a discontinued tile cannot be matched and a seam at the kitchen edge always shows.

Leveling. Large-format porcelain and long planks of wood-look tile need a flat base. We level with a sand-and-cement mortar mix before setting tile, not self-leveler. Self-leveler is for vinyl and thin floors. Our residential flooring page covers the floor options we install.

Under the cabinets. We decide early whether the new floor runs under the cabinets or stops at them. Running it under costs a little more tile and gives you the freedom to change the cabinets later without a gap in the floor.

Next step: send us a photo of the rooms around your kitchen, and we will tell you where the new floor should start and stop.

Why Delray Beach Homeowners Choose J. Perry & Sons

For a kitchen renovation in Delray Beach, a clear written scope should cover the existing conditions, permit needs, materials, work sequence, and coordination between cabinetry, countertops, electrical, plumbing, and finishes. J. Perry & Sons holds Florida General Contractor License CGC1540699.

Remodeling Your Delray Beach Kitchen While You Are Away

Infographic listing six ways a Delray Beach kitchen remodel is managed while the owner is away for the season.

Some Delray Beach owners live here only part of the year, and they often ask if the kitchen can be done while they are up north. It can, and it goes well when a few things are set up before you leave.

Make the decisions first. Cabinets, slabs, tile, hardware, appliances and lighting are all selected and approved before demolition. A kitchen stalls when a choice is left for later and you are not there to make it.

Approvals in place. The permit and any HOA or historic approval are handled by us before the start, with your signatures collected ahead of time.

Access and protection. We agree on key or gate access, protect the floors and furniture outside the kitchen and keep the rest of the house closed off from dust.

Changes in writing. If something is found behind a wall, we explain what we found and you approve the fix in writing before we continue.

Inspections and the final walk. We meet the inspectors, and when the kitchen is done, we walk it with you in person or by video.

Our guide to renovating while you are away covers the rest of the house too. Your schedule is set out in the written proposal.

Next step: tell us when you plan to leave, and we will plan the selections and approvals around it.

FAQ

Do I need historic approval to remodel my kitchen in Delray Beach?

Usually not for interior work. If your home is in a historic district and the plan changes a window, a door or anything visible from the street, the city's historic preservation review comes before the building permit.

What is the difference between a custom kitchen remodel and a standard one?

In a custom kitchen, every cabinet is drawn for your room and your appliances, you approve shop drawings and you pick the actual slabs. A standard kitchen uses set cabinet sizes with fillers to close the gaps.

Can I add an island with a sink to my Delray Beach kitchen?

In most single-family homes, yes. The slab is trenched for the drain and power, and then patched before the new floor goes in. Plumbing and electrical work is done by licensed plumbers and electricians, coordinated by J. Perry & Sons.

Can you remodel my kitchen while I am out of town for the season?

Yes. We collect all selections and approvals before demolition, set up access, meet the inspectors and get your written approval for any change.

How do I choose between kitchen remodeling contractors in Delray Beach?

Check the license, ask who pulls the permit and who does the plumbing and electrical, and compare what materials each proposal names. A clear written proposal with the full order of work makes the comparison easy.

A kitchen planned around the way you live.

Considered layouts. Beautiful materials. A space that feels like you.

Plan My Kitchen

Free project review · (561) 556-7509

Kitchen architectural design concept

By submitting, you agree that J. Perry & Sons may contact you by phone, text or email about your project.

Transform Your Kitchen Renovation — Free Project Review

South Florida renovation contractor. Florida General Contractor License CGC1540699. Request your Free Project Review.

Related Topics

kitchen renovation Delray Beachkitchen remodel Delray Beach FLkitchen contractor Delray Beachkitchen renovation near me Delray Beachkitchen remodeling Palm Beach County

Request a Free Project Review

Ready to start your renovation? Call us or fill out the form for a free, no-obligation project review.

(561) 556-7509Request Free Project Review
Extraordinary spaces. A thoughtful first step.

Share your vision for your South Florida home.

Book My Free Project Review

Free project review · (561) 556-7509

Extraordinary Spaces architectural design concept